Board letter re report / accepted as filed
101470.pdf · PDF · 280.8 KB · 3 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of an application batch with the Nova Scotia Energy Board. It contains the 2025 Community Feed-In Tariff (COMFIT) Report, which outlines the status of COMFIT projects, energy purchased by NS Power, and associated costs; a table comparing COMFIT generation and cost data to provincial totals; details on NS Power's 2025 Annual Load Forecast and Fuel Adjustment Mechanism (FAM) Report; capacity factors for wind projects; and information on the COMFIT Biomass CHP Tariff and associated payments.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12687 — Nova Scotia Power Inc. - 2025 COMFIT Annual Report
Filing event: APPLICATION on 04/02/2026