Application
N-1.pdf · PDF · 3.8 MB · 73 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of a regulatory application batch with the Nova Scotia Energy Board (NSEB), containing summaries of various chunks related to NSP Maritime Link Inc.'s (NSPML) application to review and terminate the Holdback Mechanism. Topics covered include NSPML's request to end the Holdback, performance metrics of the Maritime Link project, energy delivery levels, conditions for terminating the Holdback, regulatory decisions, and details about planned and unplanned outages, as well as financial and operational performance data.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12696 — NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
Filing event: APPLICATION on 02/03/2026