N-9 Exhibits 06/11/2026

BW (IG) RIR 1 to 5

Download original
N-9.pdf · PDF · 196.9 KB · 8 pages
AI overviewWhat this document contains

This document is an exhibit (N-9) from a RIR batch filed in a Nova Scotia Energy Board regulatory matter. It contains summaries of responses to information requests regarding NSP Maritime Link Inc.'s application to terminate a holdback mechanism, including analyses of NSPML's compliance with evidentiary thresholds, assessments of good utility practice, and the impact of extreme weather and design limitations on outages.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12696 — NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism

Filing event: RIR on 06/11/2026

8 pages
100%