101971 Other documents 05/13/2026

Board Letter re: Accepted as filed

Download original
101971.pdf · PDF · 244.8 KB · 1 page
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch. It contains a letter from Jennifer Ross, Director of Regulatory Planning & Compliance at Nova Scotia Power Inc., addressed to herself, with no substantive content. The document also references a Storm Outage Analysis Report submitted by Nova Scotia Power Inc. following a December 3, 2025 storm, which was accepted by the Board and closed on February 13, 2026.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12707 — Nova Scotia Power Inc. - Storm Outage Analysis Report - December 3, 2025

Filing event: APPLICATION on 05/13/2026

1 page
100%