C-1 Exhibits 03/04/2026

Notice of Appeal (redacted)

Download original
C-1.pdf · PDF · 86.0 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a notice of appeal related to a dispute over NS Power's refusal to compensate for excess solar generation in 2025, including references to a DRO decision, allegations of metering issues, and a request to repeal Section 7(4) of the Nova Scotia Electricity Act.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12732 — NSPI DRO Appeal - Meter Issues - Hunter Cooling

Filing event: APPLICATION on 03/04/2026

3 pages
100%