NSEB (NSPI) IR-1 to IR-4
101625.pdf · PDF · 192.4 KB · 3 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of a regulatory matter containing four information requests (IR-1 to IR-4) issued by the Nova Scotia Energy Board to Nova Scotia Power Inc. regarding a $3.25 million turbine refurbishment project for the LIN1 HP IP Turbine, including details on the unit's operational history, refurbishment scope, financial estimates, and potential replacement costs.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12745 — Nova Scotia Power Inc. - CI C0080671 – LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384
Filing event: APPLICATION on 04/17/2026