Reply Submission - PHP
102307.pdf · PDF · 387.8 KB · 2 pages
AI overviewWhat this document contains
This document is a reply submission from Port Hawkesbury Paper LP in a Nova Scotia Energy Board regulatory matter. It responds to the 2025 ELIADC Tariff Report by NS Power, addressing concerns regarding Cause Code 5 hours, discrepancies in calculated ELIADC benefits, and the impact of actual costs on tariff calculations.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12768 — Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report