L-10 Exhibits 07/13/2026

NSPI (NSEB) Second Set - RIR-3 to RIR-4

Download original
L-10.pdf · PDF · 127.3 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains information related to NS Power's response to an information request regarding an estimated meter read, details about remote meter readings for Mr. Adam, and information about flexible payment arrangements offered for an outstanding balance.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12777 — NSPI DRO Appeal - Billing Issues - Miguel Adam

Filing event: RIR on 07/13/2026 · View digest →

3 pages
100%