103049 Other documents 07/31/2026

Letter E1 re: Advise of an agreement between E1 and the IG, dated July 31, 2026.

Download original
103049.pdf · PDF · 119.3 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains information regarding an agreement between EfficiencyOne and the Industrial Group concerning a study to assess the potential value of customer participation in the Large Industrial Interruptible Rider outside of Nova Scotia Power-dispatched interruptible events, including steps for conducting a DR Participation Study and evaluating the feasibility and cost-effectiveness of DR participation.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12780 — EfficiencyOne - 2027-2031 Demand Side Management (DSM) Plan Application

Filing event: APPLICATION on 07/31/2026 · View digest →

4 pages
100%