102319 Other documents 06/09/2026

Board letter re: IRP report

Download original
102319.pdf · PDF · 263.7 KB · 2 pages
AI overviewWhat this document contains

This exhibit is a Board letter addressing the Integrated Resource Plan (IRP) report, outlining requirements for revised Terms of Reference aligned with the Dunsky report, emphasizing robust planning across scenarios, regional system integration with New Brunswick, and a scorecard prioritizing least-cost planning, GHG reduction, technology risk, and economic growth. It also specifies stakeholder engagement and a 2026 deadline for the final IRP report.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12854 — Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2026 Integrated Resource Planning (IRP)

2 pages
100%