102381 Other documents 06/15/2026

Synapse (NSPI) IR 1 to 21

Download original
102381.pdf · PDF · 310.4 KB · 12 pages
AI overviewWhat this document contains

This document is an information request (IR) filed as part of a regulatory matter with the Nova Scotia Energy Board. It contains a series of detailed requests directed at Nova Scotia Power Incorporated (NSPI) regarding various aspects of its 2026 Load Forecast Annual Report, including methodology, data sources, model specifications, sensitivity analyses, and assumptions related to load forecasting, temperature modeling, distributed energy resources, heat pump adoption, electric vehicle demand, solar generation, demand-side management, and other technical and economic factors.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12861 — Nova Scotia Power Inc. (NSPI) - 2026 Load Forecast Report

Filing event: APPLICATION on 06/15/2026 · View digest →

12 pages
100%