L-2 Exhibits 06/30/2026

Lunenburg Electric (NSEB) RIR 1 to 10

Download original
L-2.pdf · PDF · 126.4 KB · 8 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of a RIR batch in a Nova Scotia Energy Board regulatory matter. It contains responses by the Lunenburg Electric Utility to information requests regarding a $600,000 capital expenditure for replacing overhead transformers, including cost breakdowns, transformer specifications, maintenance procedures, contract details, voltage system upgrades, and transformer disposal procedures.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12874 — Lunenburg Electric Utility Capital Approval 2026 Transformer Project

Filing event: RIR on 06/30/2026

8 pages
100%