103162 Other documents 08/11/2026

Submissions - SBA

Download original
103162.pdf · PDF · 331.9 KB · 1 page

No AI summary available — too little text in this document to summarize.

Filed in: M12898 — Nova Scotia Power Inc. - Distribution Routines CI Various- D055 – Planned Replacement of Deteriorated Equipment (ATO) - $11,359,8222025 ACE Plan – Routine Capital - Authorization to Overspend (ATO):Distribution Routines – Non-Confidential • D055 – Planned Replacement of Deteriorated Equipment: ATO amount $11,359,822

1 page
100%