CI C0083451 - Seton Ridge Underground Network - Report - Redacted
N-1.pdf · PDF · 2.7 MB · 50 pages
AI overviewWhat this document contains
This document is an exhibit (Exhibit N-1) from a Nova Scotia Energy Board regulatory matter, containing a detailed capital project estimate for the Seton Ridge Underground Network. It covers infrastructure installation, cost breakdowns (including labor, materials, and contingency), voltage upgrade planning, load impact studies, and technical specifications for the project, with portions redacted.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12900 — Nova Scotia Power Inc. - CI C0083451 - Seton Ridge Underground Network - $3,656,609 (U&U)Unforeseen & Unbudgeted (U&U) Capital Items:C0083451 - Seton Ridge Underground Network - $3,656,609 $0 spent as at March 31, 2026 Partially Confidential
Filing event: APPLICATION on 06/11/2026