N-5 Exhibits 10/09/2026

IESO (NSPI) RIR 1 to 6

Download original
N-5.pdf · PDF · 188.8 KB · 8 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing responses from the IESO Nova Scotia to information requests by NSPI regarding the 2026 Integrated Resource Plan (IRP) and 10-Year System Outlook (10YSO) Report. Topics covered include the role of the IRP in resource procurement, contingency plans for delayed resource development, assumptions underlying projected biomass generation, and the inclusion of unit conversion in the planning process.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12916 — Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 10-Year System Outlook Report for 2026

Filing event: RIR on 10/09/2026 · View digest →

8 pages
100%
⬇