103366 Other documents 08/28/2026

CA (NSPI) IR 1 to 19

Download original
103366.pdf · PDF · 86.5 KB · 8 pages
AI overviewWhat this document contains

This document is an IR (Information Request) response filed in a Nova Scotia Energy Board regulatory matter. It contains a series of questions and requests directed to NS Power regarding the performance, design, and evaluation of Time-Varying Pricing (TVP) tariffs, including Time-of-Use (TOU) and Critical Peak Pricing (CPP) programs, load-shifting outcomes, customer satisfaction, tariff modifications, and cross-program coordination with EfficiencyOne.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12932 — Nova Scotia Power Inc. (NSPI) - Time-Varying Pricing Pilot Program - 2024/25 (Year Four) and 2025/26 (Year Five) Evaluation Reports

Filing event: APPLICATION on 08/28/2026 · View digest →

8 pages
100%