Appellants Billing Information (redacted)
W-5.pdf · PDF · 4.7 MB · 7 pages
AI overviewWhat this document contains
This document is an exhibit containing multiple billing statements and related records from Nova Scotia Power Inc. for a customer during the billing period from January 24th to March 24th, 2026. It includes consumption data, meter readings, billing adjustments, and notes about the absence of Advanced Metering Infrastructure (AMI) reads for various dates during the period.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12947 — NSPI DRO Appeal - Meter and Power Consumption - Bernard Wentzell
Filing event: APPLICATION on 07/08/2026 · View digest →