B-1 Exhibits 07/15/2026

2026 Flowthrough Application & Methodology

Download original
B-1.pdf · PDF · 154.2 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of a regulatory application batch with the Nova Scotia Energy Board. It contains the Berwick Electric Commission's 2026 Flowthrough Application & Methodology, which outlines a request to adjust customer rates due to increased purchased power costs and includes details on the calculation of a $222,896 increase in supply costs, a proposed 3.155% rate increment, and the inclusion of a true-up mechanism in the next General Rate Application.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12969 — Berwick Electric Commission - 2026 Flow Through Application

Filing event: APPLICATION on 07/15/2026 · View digest →

4 pages
100%