B-2 Exhibits 07/29/2026

Proposed Rates - Schedule A

Download original
B-2.pdf · PDF · 105.7 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an order batch in a Nova Scotia Energy Board regulatory matter. It contains proposed electricity rates and related charges, including billing procedures, interest rates for late payments, service-specific rate structures, compensation policies for energy management, demand reduction incentives, and cost details for various lighting systems and fixtures.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12969 — Berwick Electric Commission - 2026 Flow Through Application

Filing event: ORDER on 07/29/2026 · View digest →

4 pages
100%