103767 Key documents 10/02/2026

Hearing Order

Download original
103767.pdf · PDF · 199.0 KB · 2 pages
AI overviewWhat this document contains

This document is a Hearing Order exhibit related to a regulatory matter concerning an application by Nova Scotia Power Incorporated for approval of a Capital Work Order for an Oracle MDM Upgrade, with a total cost of $8,211,297. It outlines the procedural timetable for the regulatory proceeding, the method of distribution of the Hearing Order, and references the governing rules for the filing process.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M13082 — Nova Scotia Power Inc. - CI C0047278 – IT – Oracle MDM Upgrade - $8,211,297

Filing event: ORDER on 10/02/2026 · View digest →

2 pages
100%
⬇