104046 Other documents 10/22/2026

Renewall (NSPI) IR 1 to 7

Download original
104046.pdf · PDF · 953.6 KB · 5 pages
AI overviewWhat this document contains

This document is an information request (IR) filed in a Nova Scotia Energy Board regulatory matter. It contains multiple requests for clarification regarding securitization of unrecovered fuel costs, the impact on proposed securitization balances, the treatment of future fuel costs in securitization scenarios, billing and collection procedures for the Securitization Cost Recovery Rider, compliance with the More Access to Energy Act, and the classification of RTR Implementation Costs under regulatory frameworks.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M13133 — Nova Scotia Power Inc. - Application for Financing Order authorizing the Securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider

Filing event: APPLICATION on 10/22/2026 · View digest →

5 pages
100%
⬇