E-1Application
15 passages
1.1 APPROVAL OF SETTLEMENT PLAN - E1 requests approval by the Nova Scotia Utility and Review Board (the "Board" or "NSUARB") of its - Settlement Plan for the term 2023 through 2025 which is attached hereto as Appendix "A." - The Settlement...
AI summary E1 seeks approval of its 2023–2025 Settlement Plan (DSM Plan) by the Nova Scotia Utility and Review Board. The plan aims to deliver cost-effective energy efficiency, reduce electricity costs, increase consumer awareness, and support climate initiatives through 412.7 GWh of energy savings and 96.7 MW of demand reductions, with a focus on underserved markets.
10.2 DEMAND RESPONSE SHOULD BE TREATED AS A PERFORMANCE INDICATOR As a new portfolio item that will introduce an additional 17.9 MW of capacity to the grid by the end of 2025, DR will become an important contributor toward the overall 96.7...
AI summary E1 argues that demand response (DR) should be treated as a performance indicator between 2023 and 2025, given its role in contributing to system-peak demand savings under the 2023-2025 DSM Plan and its complementarity with demand reduction activities under the Settlement Plan.
5 6 Figure 4: Other Stakeholder Groups that E1 engaged in the DSM Plan Development
AI summary This section references Figure 4, which outlines other stakeholder groups that E1 engaged with during the development of the DSM Plan. The figure is referenced but not described in detail in the text.
2.3.3.6 PHASE 6 – QUALITY ASSURANCE - All assumptions used in final DSM Plan models undergo further quality assurance to ensure accuracy in all - assumptions and variables used in the DSM Plan modelling process.
AI summary Phase 6 of the process involves quality assurance for all assumptions and variables used in the final DSM Plan models to ensure accuracy in the modelling process.
14 Component Investment Energy Savings Demand Savings Participation Annual Plan22 ($M) (GWh) (MW) (products) (projects) 2023 Total 1.3 1.9 0.6 133 42 2024 Total 1.3 1.9 0.6 133 42 2025 Total 1.4 1.9 0.6 133 42 Target Market banks and commu...
AI summary The 2023-2025 Annual Plan outlines investment and energy savings targets for demand-side management programs. It includes funding, energy savings, demand savings, and participation metrics. The program targets affordable housing providers, offering energy efficiency audits, contractors, and rebates for residential facilities.
7.4.2 OVERVIEW - Other Enabling Strategies for 2023-2025 is comprised of Regulatory Affairs activities, which include the - following activities: - NSUARB processes, such as DSM Plan development and reporting; - DSM Advisory Group initiati...
AI summary This section outlines the activities under Other Enabling Strategies for 2023-2025, including regulatory affairs, DSM Plan development, stakeholder consultation, industry research, and legal work related to regulatory initiatives. Table 62 summarizes the three-year investment and focus areas for this component.
7.4.3.1 DSM PLAN DEVELOPMENT & REPORTING - DSM Plan development and reporting activities are an essential function of E1's Regulatory Affairs Team. - Through its Enabling Strategies, Regulatory Affairs manages all demand side management re...
AI summary The document outlines the development and reporting activities related to the DSM Plan by E1's Regulatory Affairs Team, including the creation of the 2026-2028 DSM Resource Plan, collaboration with NS Power and stakeholders, and submission of various reports and studies to the NSUARB.
A. Energy Efficiency Process Model E1 will use the system wide avoided costs of T&D as calculated by NS Power for the energy efficiency portfolio in the 2023-2025 DSM Plan. The calculated values are an outcome of resolving the remaining it...
AI summary E1 will use the system-wide avoided costs of T&D as calculated by NS Power for the energy efficiency portfolio in the 2023-2025 DSM Plan, extrapolating values using a 2% annual inflation rate from a 2021 snapshot.
be used for all DSM Plan scenarios, whether or not they are identical to a Potential Study scenario. For years beyond the IRP's termination in 2045, E1 assumed the 2045 intensity will remain the same. [Table 6](#page-67-0) below describes...
AI summary The text discusses methodology options for calculating avoided costs of carbon in the 2023-2025 DSM Resource Plan, including scaling factor variants of the Round 1 approach and a 'with TOU adjustments' variant of the DICE method. It mentions stakeholder discussions and a suggestion from Paul Chernick of Resource Insight.
Table 6 Calculation method Savings Intensity Round 1 Model approach used for 2023-2025 DSM Plan • All DSM savings • One average production intensity per year • Future intensities calculated by dividing total emissions by Net System Require...
AI summary Table 6 outlines two calculation methods used for the 2023-2025 DSM Plan. The first method considers all DSM savings with one average production intensity per year, while the second method uses a scaling factor and considers some DSM savings, though the amount is not determined.
Memorandum To: EfficiencyOne From: Guidehouse Date: February 16, 2022 Re: Forecasting DSM Plan Participation Jurisdictional Scan – Findings and Recommendations
AI summary This memorandum from Guidehouse to EfficiencyOne outlines findings and recommendations from a jurisdictional scan on forecasting DSM Plan participation. It provides insights into how different regions approach demand-side management planning and forecasting.
Appendix A Attachment 4: 2023-2025 Settlement Plan Measure-level Energy Efficiency Technical Tables
AI summary This document presents technical tables related to the 2023-2025 Settlement Plan Measure-level Energy Efficiency. It includes detailed data on energy efficiency measures and their implementation.
Appendix B Rate and Bill Impact Analysis of the 2023-2025 DSM Plan
AI summary This document provides a rate and bill impact analysis of the 2023-2025 DSM Plan, focusing on how the plan will affect customer rates and bills over the specified period.
f reference for considering the appropriate balance of these impacts across electricity customers. Two DSM plans have been modelled within this analysis – E1's Settlement 2023-2025 DSM Resource Plan (Settlement Plan) and its Alternate Scen...
AI summary The analysis compares two DSM plans, Settlement 2023-2025 and its Alternate Scenario, evaluating their impacts on electricity customers. It examines the differences between scenarios with and without DSM, focusing on non-participant bill impacts and the affordability of DSM initiatives.
2. SCENARIOS - Two separate models were created for this Plan: a Settlement Plan model and an Alternate Scenario model. - Each model compares two scenarios: a DSM scenario and a no-DSM scenario. The DSM scenario in each - model includes th...
AI summary The document describes two models created for the Plan: a Settlement Plan model and an Alternate Scenario model. Each model compares a DSM scenario, which includes the costs and benefits of planned DSM programs from 2023-2025, with a no-DSM scenario that excludes these costs and benefits.
E-12E1(NSUARB) RIR-1 to RIR-41
31 passages
orities 17 as: safety, reliability, affordability, clean energy, and robustness. With regard to the 18 environmental standards considered in the 2020 NS Power IRP, NS Power noted: Date Filed: April 29, 2022 E1 (NSUARB) IR-01 Page 2 of 4 M1...
AI summary EfficiencyOne (E1) seeks approval for a supply agreement with NS Power under the 2023-2025 DSM Plan. The proceeding references environmental standards from NS Power's 2020 Integrated Resource Plan (IRP) and affordability considerations as key priorities.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary EfficiencyOne (E1) provided responses to the Nova Scotia Utility and Review Board (NSUARB) regarding the 2023-2025 Demand Side Management (DSM) Plan between E1 and NS Power. The document outlines E1's non-confidential replies to regulatory information requests.
rements are reflective 23 of current conditions; while over the longer-term, the results will provide a directional path 24 toward optimal supply side and demand-side options. 1 NS Power website “Powering a Green Nova Scotia, Together” htt...
AI summary E1 aligns the 2023–2025 DSM Plan with the 2020 Integrated Resource Plan (IRP), citing stakeholder input and alignment with Nova Scotia ratepayers' best interests. The response addresses NSUARB information requests regarding the supply agreement with NS Power.
ities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 [Evidence] 2 Request IR-03: 3 4 Page 8 of 65 of the Application references the “lesson...
AI summary EfficiencyOne (E1) responded to the NSUARB's request about pandemic-related adaptations in the 2023-2025 DSM Plan, detailing virtual service delivery methods and new program pilots to offset pandemic impacts on participation and savings targets.
t, a pay-for-performance pilot and additional focus on compressed air management in 25 Custom, and performance-based incentives for large industrial customers in Strategic Energy 26 Management. Date Filed: April 29, 2022 E1 (NSUARB) IR-03...
AI summary EfficiencyOne (E1) seeks NSUARB approval for a supply agreement with NS Power under the 2023-2025 DSM Plan, including a pay-for-performance pilot and industrial compressed air management initiatives. The filing date is April 29, 2022, with reference to matter M10473.
ated to reflect the latest 18 guidance from Nova Scotia public health officials. E1 will continue to evaluate and update its Safe 19 Work Practices as the COVID-19 pandemic continues to evolve. Date Filed: April 29, 2022 E1 (NSUARB) IR-03...
AI summary E1 submitted an application for approval of a supply agreement for electricity efficiency and conservation activities with NS Power under the 2023-2025 DSM Plan. The response addresses NSUARB information requests and includes updates to Safe Work Practices aligned with Nova Scotia public health guidance.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 Request IR-04: 2 3 On p. 10 of 65, E1 stated that the proposed energy savings of 412.7 GWh r...
AI summary E1 responds to NSUARB's queries about its 2023-2025 DSM Plan, stating it includes 78.8 MW of peak demand savings and 17.9 MW from demand response. E1 asserts its mandate does not prioritize energy savings over peak demand savings, aligning both with the 2020 Integrated Resource Plan (IRP). The response references NS Power’s 2021 Load Forecast for context.
on 25 for the first time in the 2020 IRP. E1 further submits that the agreement reached between 1 M10109. NS Power 2021 Load Forecast Report. April 30, 2021. Page 9 of 89. Date Filed: April 29, 2022 E1 (NSUARB) IR-04 Page 1 of 2 M10473 – E...
AI summary E1 and NS Power argue that the Settlement Plan allocation between energy and demand savings in the 2023-2025 DSM Plan balances utility and ratepayer interests, aligning with the best interests of ratepayers. The application references prior load forecasts and regulatory proceedings.
(0.025) (0.017) (0.032) 0.006 0.009 0.044 0.036 Year Over Year Actual (0.012) (0.007) 0.007 (0.008) 0.050 0.024 0.032 0.030 0.068 (0.048) 0.006 Date Filed: April 29, 2022 E1 (NSUARB) IR-05 Page 1 of 7 M10473 – EfficiencyOne (E1) Applicatio...
AI summary The document presents tables comparing approved and actual energy efficiency investments and savings from 2015 to 2025, highlighting variances. It is part of E1's application for approval of a supply agreement for the 2023-2025 DSM Plan, with data showing discrepancies between planned and actual outcomes.
s between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary EfficiencyOne (E1) provided responses to Nova Scotia Utility and Review Board (NSUARB) information requests regarding the 2023-2025 Demand Side Management (DSM) Plan with Nova Scotia Power. The proceeding involves regulatory processes related to information disclosure and DSM planning.
oduct Rebates in the Business, Non- 23 Profit & Institutional (BNI) sector. These factors influenced the outcome of the unit cost 24 result in 2015 as compared to the approved Plan. 2 Ibid, page 32-33 Date Filed: April 29, 2022 E1 (NSUARB)...
AI summary EfficiencyOne (E1) submitted an application for approval of a supply agreement with NS Power under the 2023-2025 DSM Plan, noting factors influencing unit cost results in 2015 compared to the approved plan, including Business, Non-Profit & Institutional (BNI) sector rebate impacts.
een E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary E1 is responding to information requests from the Nova Scotia Utility and Review Board (NSUARB) regarding the 2023-2025 Demand Side Management (DSM) Plan. The document is part of a regulatory proceeding and contains non-confidential responses.
s between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 was the first year that E1 did not provide rebates on A-Series (LEDs) in response to the 2...
AI summary E1 reported underspending and underachievement in energy savings for 2020 and 2021 due to pandemic impacts and program measure mix deviations, including higher-than-expected costs for year-round products in Residential EPR. Increased incentives in 2021 aimed to boost participation but led to overspending.
siness Energy Rebates 21 etc.). 22 • Lingering impacts caused by the COVID-19 pandemic challenged E1 in meeting its 23 energy savings targets. 8 As per the First Amending Agreement between Nova Scotia Power and E1, and approved by the NSUA...
AI summary EfficiencyOne (E1) faced challenges meeting energy savings targets due to lingering pandemic impacts. A deferred $2 million payment from Nova Scotia Power (NS Power) adjusted 2021-2022 investment amounts under the First Amending Agreement, approved by the NSUARB in 2020. The 2023-2025 DSM Plan application (M10473) is referenced.
06 Page 1 of 3 M10473 – EfficiencyOne (E1) Application for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Bo...
AI summary EfficiencyOne (E1) has submitted an application for approval of a supply agreement with NS Power under the 2023-2025 Demand Side Management (DSM) Plan. The document outlines E1's responses to information requests from the Nova Scotia Utility and Review Board (NSUARB) regarding the proposed agreement.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary EfficiencyOne (E1) provided responses to the Nova Scotia Utility and Review Board (NSUARB) regarding the 2023-2025 Demand Side Management (DSM) Plan between E1 and NS Power. The document outlines E1's non-confidential replies to regulatory information requests.
e for the portfolio is attributable to the introduction of the Residential Behaviour program 26 component in 2023 and its ramp up in 2024 and 2025. This program component has a 27 measure life of one year and is planned to achieve 8.7 GWh...
AI summary The introduction of the Residential Behaviour program in 2023 and its expansion in 2024-2025 significantly increased annual energy savings, reducing the weighted average measure life of the residential portfolio from 10.8 years in 2023 to 7.4 years in 2024 and 7.5 years in 2025, impacting overall portfolio metrics.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 Request IR-07: 2 3 Page 13 of 65 of the Application notes that the 2023-25 DSM plan has appl...
AI summary E1 responds to NSUARB queries about the 2023-2025 DSM Plan, stating innovation initiatives (e.g., beneficial electrification, market transformation) are not yet finalized but will be developed annually. The plan allocates $4.5M over three years ($1.5M annually) for R&D, though no energy or carbon savings are estimated from these initiatives.
R-07 Page 1 of 2 M10473 – EfficiencyOne (E1) Application for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review...
AI summary EfficiencyOne (E1) submitted an application for approval of a supply agreement with NS Power under the 2023-2025 DSM Plan, addressing Nova Scotia Utility and Review Board (NSUARB) information requests about potential savings from efficiency and conservation initiatives.
ities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 [Evidence] 2 Request IR-08: 3 4 Page 13 of 65 of the Application notes that the 2023-2...
AI summary EfficiencyOne (E1) outlines changes in its 2023-2025 DSM Plan compared to the 2020-2022 plan, emphasizing increased diversity through new programs like Affordable Single-Family Homes, expanded ENERGY STAR measures, and pay-for-performance services, alongside residential behavior initiatives and demand response components.
Solutions program 24 component; and 25 • inclusion of a new demand response program with multiple pathways under both the 26 residential and BNI program components. 27 Date Filed: April 29, 2022 E1 (NSUARB) IR-08 Page 1 of 1 M10473 – Effic...
AI summary The document outlines E1's application for approval of a supply agreement with NS Power for the 2023-2025 DSM Plan, including a new demand response program under residential and BNI components. Filed April 29, 2022, as part of matter M10473.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 efforts. In certain instances, these are more effective drivers of participation than electr...
AI summary E1 explains that non-electric fuel costs and water savings are included in their DSM Plan calculations, but these are considered costs that reduce cost-effectiveness. They argue these factors are not directly used in selecting measures or designing programs.
1 The DSM avoided costs used in the development of the 2023-2025 DSM Plan included for 2 energy efficiency, demand response and the rate and bill impact analysis are provided 3 below in Table 1. 4 5 Table 1: 2023-2025 DSM Plan Avoided Cost...
AI summary The 2023-2025 DSM Plan utilized avoided costs for energy efficiency, demand response, and rate and bill impact analysis. These costs were derived from NS Power's 2020 Integrated Resource Plan and updated with a 2% annual inflation rate for transmission and distribution costs.
1 that are applicable for each of Maine, Massachusetts and Vermont. Information provided 2 in Appendix D includes but is not limited to: 3 i) Authority type (Legislative or Regulatory), primary source references, and year of 4 enactment: 5...
AI summary The text outlines the legislative and regulatory frameworks for energy efficiency programs in Maine, Massachusetts, and Vermont, including applicable plans, legal references, and program applicability percentages. It details the scope and mandates of these programs across the three jurisdictions.
ure periods. This is particularly 13 relevant during the 2023-2025 planning period as Nova Scotians face the challenge of 14 climate change and the need for greater levels of DSM. Date Filed: April 29, 2022 E1 (NSUARB) IR-20 Page 2 of 2 M1...
AI summary E1 submitted responses to the NSUARB's information requests regarding the 2023-2025 DSM Plan, including a Settlement Plan that replaced the original Preferred Plan. The response includes tables showing energy savings and investment levels for various planning periods.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary EfficiencyOne (E1) provided responses to the Nova Scotia Utility and Review Board (NSUARB) regarding the 2023-2025 Demand Side Management (DSM) Plan between E1 and NS Power. The document outlines E1's non-confidential replies to regulatory information requests.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL 1 [Evidence] 2 Request IR-28: 3 4 On p. 58 or 65, E1 stated: 5 6 Under the Settlement Plan, an...
AI summary E1 provided responses to NSUARB information requests regarding the 2023-2025 DSM Plan, clarifying that the proposed demand response investment in 2023 is $1.5 million, with increases to $3.5 million in 2024 and $5.0 million in 2025.
between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary EfficiencyOne (E1) provided responses to the Nova Scotia Utility and Review Board (NSUARB) regarding the 2023-2025 Demand Side Management (DSM) Plan between E1 and NS Power. The document outlines E1's non-confidential replies to regulatory information requests.
ies between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary The text refers to responses provided by E1 to the Nova Scotia Utility and Review Board (NSUARB) regarding information requests related to the 2023-2025 Demand Side Management (DSM) Plan. This indicates a regulatory process involving DSM planning and stakeholder engagement.
1 Request IR-31: 2 3 Appendix A, page 32 of 149: please describe the modelling quality assurance process in more 4 detail. Within this response, please specially address how this process ensures accuracy in all 5 assumption and variables u...
AI summary The response to Request IR-31 details the quality assurance process used in the DSM Plan modelling, including validation of inputs, segregation of duties, and consistency checks on assumptions and variables.
ies between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Nova Scotia Utility and Review Board (NSUARB) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to information requests from the Nova Scotia Utility and Review Board (NSUARB) related to the 2023-2025 Demand Side Management (DSM) Plan. It focuses on the interaction between E1 and NS Power.
E-13E1(SBA) RIR-1 to RIR-26
26 passages
M10473 – EfficiencyOne (E1) Application for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Reques...
AI summary EfficiencyOne (E1) seeks approval for a supply agreement with NS Power under the 2023-2025 DSM Plan, with E1 responding to the Small Business Advocate's information requests. The document is non-confidential.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL 1 Response IR-01: 2 3 (a) On 22 July 2016, EfficiencyOne (E1) filed a Consensus Agreement with t...
AI summary The document outlines EfficiencyOne's (E1) responses to the Small Business Advocate (SBA) regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It references a 2016 Consensus Agreement involving multiple stakeholders, establishing DSM Standards to ensure balanced DSM planning, consistency, and alignment with regulatory decisions.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
1 • diversity of program delivery; 2 • business relationships and maintenance of market presence; 3 • access to programs by all market sectors and rate classes by addressing barriers to 4 participation; and 5 • rate impacts. 6 7 The Balanc...
AI summary The text outlines the Balanced Plan Approach for energy efficiency (EE) programs, emphasizing a 50-50 investment split between residential and BNI (Business, Non-profit & Institutional) sectors. It references the 2015 Dunsky Energy Consulting memorandum and E1's 2016-2018 DSM Resource Plan Application, aligning with design principles for the 2023-2025 DSM Plan.
n 26 objective for scenario development: an investment split for programs of 50% Residential 27 (Res) and 50% BNI. Although this is a design objective, final modelling results may not Date Filed: April 29, 2022 E1 (SBA) IR-01 Page 3 of 6 M...
AI summary EfficiencyOne (E1) submitted responses to the Small Business Advocate (SBA) regarding its 2023-2025 DSM Plan, which includes a 50/50 investment split between residential and BNI programs. The application seeks approval for a supply agreement with NS Power, with modeling results potentially diverging from the design objective.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
1 necessarily align completely, due to E1’s pursuit of balance with the other objectives noted 2 in its response to part (a) and feedback from stakeholders throughout the development 3 process. The Settlement Plan results in an investment...
AI summary E1's Settlement Plan allocates 55% to residential and 45% to BNI programs. During DSM Plan development, E1 proposed scenarios for energy savings modeling, adjusted based on DSMAG feedback, resulting in four energy efficiency scenarios and one demand response scenario.
3A: 1% of Load (Energy Savings equal to 1% of NS Power’s load) 25 4. 4A: Low-DSM (Energy Savings equal to Low-DSM from the 2019 DSM Potential Study) 26 5. Demand Response (DR) 27 Date Filed: April 29, 2022 E1 (SBA) IR-01 Page 4 of 6 M10473...
AI summary EfficiencyOne (E1) seeks approval for a supply agreement with NS Power under the 2023-2025 DSM Plan, targeting 1% load reduction and Low-DSM savings from the 2019 study. The application includes Demand Response (DR) initiatives, with responses to Small Business Advocate (SBA) information requests.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
1 The initial model results and assumptions, including design objectives were shared with the 2 DSMAG on September 29, 2021. As a result of the stakeholder feedback received on the 3 initial model results, E1 modelled four energy efficienc...
AI summary EfficiencyOne (E1) modeled multiple DSM scenarios (Mid-DSM, Base-Plus, Base-DSM, Low-DSM, and Demand Response) after stakeholder feedback, leading to the 2023-2025 DSM Resource Plan. E1 emphasized balanced DSM portfolios despite historical shortfalls and used avoided costs from the 2020 IRP Reference Plan for cost-effectiveness testing.
enario 2.0C of the 25 2020 Integrated Resource Plan (IRP) Reference Plan. There was no DSM scenario selected 26 which determines the optimal level of DSM or the avoided costs of DSM for the 2020 IRP 27 Scenario 3.1C. Therefore, E1 has not...
AI summary E1 (EfficiencyOne) states it did not select a demand-side management (DSM) scenario for the 2020 Integrated Resource Plan (IRP), preventing cost-effectiveness testing for the 2023-2025 DSM Plan. Responses to SBA requests refer to sections in the DSM Resource Plan but do not provide direct figures on savings or spending percentages.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
381.0 381.0 EE portfolio includes Residential Sector EE programs, BNI Sector EE programs, and Enabling Strategies 1 2 (b) Please refer to E1’s IR Response in part (a) of this IR. Date Filed: April 29, 2022 E1 (SBA) IR-03 Page 3 of 3 M10473...
AI summary EfficiencyOne (E1) references its prior response to the Small Business Advocate (SBA) regarding the 2023-2025 DSM Plan supply agreement with NS Power. The document is part of a regulatory proceeding (M10473) under the NSUARB.
Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL 1 Request IR-04: 2 3 Throughout the EfficiencyOne 2023-2025 DSM Resource Plan, EfficiencyOne uses a...
AI summary EfficiencyOne (E1) explains its 2% inflation assumption for the 2023-2025 DSM Plan, citing IMF and Bank of Canada data, and commits to maintaining spending within NSUARB-approved levels despite potential inflation changes. A 4% inflation assumption in Figure 6 is also referenced.
R-04 Page 1 of 2 M10473 – EfficiencyOne (E1) Application for Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) I...
AI summary EfficiencyOne (E1) responds to the Small Business Advocate (SBA) regarding its 2023-2025 DSM Plan, addressing inflation assumptions and expenditure deferral strategies to meet performance targets. E1 cites 4% inflation (2022-2023) tied to post-pandemic pressures and considers deferring costs to achieve goals.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
ness/efficacy. For example, for 2021, 21 E1 recommended that additional free-ridership surveys be used by the Evaluation 22 Consultant, early in the project, for larger Custom New Construction projects with long 23 execution timeframes. Th...
AI summary E1 recommends using additional free-ridership surveys early in large Custom New Construction projects with long timelines to better capture participants' motivations during decision-making for the Custom program component, as part of the 2023-2025 DSM Plan application.
tion Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL 1 (c) Please refer to NS Power’s Excel-based Rate Model (Attachment 6, Appendix B of E1’s 2023...
AI summary EfficiencyOne (E1) responds to the Small Business Advocate (SBA) by referencing its Excel-based Rate Model and RBIA Model in the 2023-2025 DSM Plan application. The document is part of a regulatory proceeding (M10473) concerning a supply agreement between E1 and NS Power for energy efficiency and conservation activities.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL 1 Request IR-08: 2 3 Please refer to the EfficiencyOne 2023-2025 DSM Resource Plan, Section 4.5....
AI summary E1 explains that diversity in program delivery under the 2023-2025 DSM Plan reduces risks of missing performance targets by offsetting market and customer-related uncertainties. This approach was informed by a 2015 Dunsky Energy Consulting memorandum referenced in NSUARB's Balanced Plan Approach.
ndum, and specifically consideration number three, describes how 26 the DSM Plan should consider the minimization of risk through a diverse portfolio and 27 sustained market presence. Date Filed: April 29, 2022 E1 (SBA) IR-08 Page 1 of 4 M...
AI summary EfficiencyOne (E1) submitted an application for approval of a supply agreement with NS Power under the 2023-2025 DSM Plan, responding to Small Business Advocate (SBA) information requests. The application emphasizes risk minimization through a diverse portfolio and sustained market presence in the DSM Plan.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
rkets: Similarly, offering DSM initiatives to a broad range of markets and 22 consumers provides an important hedge against sectoral shifts. For example, with a 23 diversified portfolio, if markets do not respond as anticipated to a strate...
AI summary The text discusses diversifying demand-side management (DSM) initiatives across markets to hedge against sectoral shifts, allowing budget reallocation if initial strategies fail. It references E1's 2023-2025 DSM Plan application with NS Power and responses to SBA's information requests, emphasizing flexibility in program funding.
ctivities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The text refers to activities between EfficiencyOne (E1) and Nova Scotia Power (NS Power) regarding the 2023-2025 Demand Side Management (DSM) Plan, including E1's responses to information requests from the Small Business Advocate (SBA). It highlights collaboration on DSM initiatives and transparency efforts with stakeholders.
ctivities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL 1 Response IR-11: 2 3 (a) The requested information is available through examination of the technica...
AI summary E1 provided responses to the Small Business Advocate's information requests regarding the 2023-2025 DSM Plan, including references to technical tables and performance indicators. The key assumptions and design objectives were shared with the DSMAG, and no significant changes were requested during the scenario development phase.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
on Activities between E1 and NS Power (2023-2025 DSM Plan) E1 Responses to Small Business Advocate (SBA) Information Requests NON-CONFIDENTIAL
AI summary The document outlines E1's responses to the Small Business Advocate's information requests regarding activities between E1 and NS Power under the 2023-2025 DSM Plan. It highlights interactions related to demand-side management and stakeholder engagement in regulatory proceedings.
E-30E1 Compliance Filing 2023-2025 with Appendix A-D FINAL
15 passages
4.1 RESEARCH INITIATIVES The 2023-2025 DSM Plan increases investment in development and research specifically targeting innovation, pilots and emerging technologies. E1 has initiated and continues to develop an innovation process for consi...
AI summary The 2023-2025 DSM Plan emphasizes increased investment in innovation, pilots, and emerging technologies. E1 is developing an innovation process for research initiatives, as directed by the Board to ensure prudent use of ratepayer funds. E1 commits to preparing and documenting detailed plans for research initiatives and discussing them with the DSM Advisory Group prior to implementation.
4.11 SUPPLY AGREEMENT - The final executed Supply Agreement giving effect to the 2023-2025 DSM Plan as approved by the Board is - filed herewith.
AI summary The final executed Supply Agreement implementing the 2023-2025 DSM Plan, as approved by the Board, is filed with the document.
- 3 E1 conducted stakeholder engagement on the 2023-2025 DSM Plan with a variety of other external 4 stakeholder groups, illustrated in [Figure 4,](#page-40-2) below. - 5 - 6 Figure 4: Other Stakeholder Groups that E1 engaged in the DSM Pl...
AI summary E1 conducted stakeholder engagement on the 2023-2025 DSM Plan with various external stakeholder groups, as illustrated in Figure 4.
2.3.3.6 PHASE 6 – QUALITY ASSURANCE - All assumptions used in final DSM Plan models undergo further quality assurance to ensure accuracy in all - assumptions and variables used in the DSM Plan modelling process.
AI summary Phase 6 of the process involves quality assurance for all assumptions and variables used in the final DSM Plan models to ensure accuracy.
11 Component Investment Energy Savings Demand Savings Participation Continuing to build on the prescriptive rebate stream, introduced in the 2020-2022 DSM Plan, to help address barriers to participation for property owners with smaller (e....
AI summary The document discusses enhancements to the prescriptive rebate stream under the 2023-2025 DSM Plan, focusing on improving heating system efficiency in affordable housing through rebates for heat pumps and water heaters.
Performance Targets consist of: - Cumulative annual energy savings; - Cumulative annual system-peak demand savings; Performance targets are at the portfolio (i.e. DSM Plan) level. The cumulative annual system-peak demand savings Performanc...
AI summary Performance targets include cumulative annual energy and system-peak demand savings, with specific exclusions for demand response savings from new or available demand capacity. Targets are set at the DSM Plan level and apply to specific programs such as Affordable Single-family Homes and Mi'kmaw Home Energy Efficiency Project.
ISSUE The purpose of the avoided costs discussion with the Demand Side Management Advisory Group (DSMAG) was to achieve the following deliverable as described in the DSMAG Terms of Reference: " Developing a methodology and process for ensu...
AI summary The discussion with the Demand Side Management Advisory Group (DSMAG) aimed to develop a methodology for regularly updating avoided costs information for DSM planning in Nova Scotia. The objectives included defining avoided costs, establishing estimation methodologies, determining update timing, and finalizing values for the 2023-2025 DSM Plan. Although the original timeline has passed, the goal remains to resolve outstanding issues promptly.
DSM PLANNING MODELS THAT USE AVOIDED COST INPUTS - A. Energy Efficiency Process Model: The following five categories of avoided costs will be used to calculate the benefits of the energy efficiency portfolio for the 2023-2025 DSM Plan and...
AI summary The document outlines the use of avoided cost inputs in three planning models for the 2023-2025 DSM Plan. These models include the Energy Efficiency Process Model, the Demand Response DRSim Model, and the Rate and Bill Impact Analysis (RBIA), each using different categories of avoided costs to calculate benefits and perform cost-effectiveness testing.
be used for all DSM Plan scenarios, whether or not they are identical to a Potential Study scenario. For years beyond the IRP's termination in 2045, E1 assumed the 2045 intensity will remain the same. Table 6 below describes the methodolog...
AI summary The text discusses methodology options for calculating avoided costs of carbon in the 2023-2025 DSM Resource Plan, including scaling factors and adjustments to the DICE method. It references stakeholder discussions and suggestions from Paul Chernick of Resource Insight.
Table 6 Calculation method Savings Intensity Round 1 Model approach used for 2023-2025 DSM Plan • All DSM savings • One average production intensity per year • Future intensities calculated by dividing total emissions by Net System Require...
AI summary Table 6 outlines two calculation methods used for the 2023-2025 DSM Plan. The first method includes all DSM savings and uses an average production intensity per year. The second method applies a scaling factor, resulting in some DSM savings (amount not determined) and maintaining the same intensity calculation.
Memorandum To: EfficiencyOne From: Guidehouse Date: February 16, 2022 Re: Forecasting DSM Plan Participation Jurisdictional Scan – Findings and Recommendations
AI summary This memorandum from Guidehouse to EfficiencyOne outlines findings and recommendations from a forecasting jurisdictional scan related to the DSM Plan. It provides insights into potential participation and implementation challenges across different regions.
2 2.1.2 OTHER EXTERNAL STAKEHOLDER ENGAGEMENT - 3 E1 conducted stakeholder engagement on the 2023-2025 DSM Plan with a variety of other external 4 stakeholder groups, illustrated in [Figure 4,](#page-91-2) below. - 6 Figure 4: Other Stakeh...
AI summary Nova Scotia Power (E1) engaged with various external stakeholder groups in the development of the 2023-2025 Demand Side Management (DSM) Plan, as illustrated in Figure 4.
14 Component Investment Energy Savings Demand Savings Participation Enhancements in 2023-2025 Continuing to build on the prescriptive rebate stream, introduced in the 2020-2022 DSM Plan, to help address barriers to participation for proper...
AI summary The 2023-2025 DSM Plan enhances the prescriptive rebate stream introduced in the 2020-2022 DSM Plan, aiming to address participation barriers for property owners with smaller buildings. It includes new rebate opportunities for heat pumps, particularly mini-splits and heat pump water heaters, to improve heating efficiency in affordable housing.
- 3 Table 47: 2023-2025 Custom Incentives Performance Indicators Year Investment First-Year Energy Savings Lifetime Energy Savings Peak Demand Savings esource st (TRC)ª gram strator st (PAC) b Participation (projects) c Participation (part...
AI summary Table 47 outlines the performance indicators for custom incentives from 2023 to 2025, including investment, energy savings, peak demand savings, and costs. The data shows a steady increase in investment and energy savings over the three-year period, with consistent unit costs and participation metrics.
53 The 2024 Payment Schedule will be revised to credit NSPI for any amounts owing to 54 NSPI related to underspend from the 2020-2022 DSM Plan.
AI summary The 2024 Payment Schedule will be revised to credit Nova Scotia Power Inc. for any amounts owed related to underspend from the 2020-2022 DSM Plan.
E-312023-2025 EOne NSPI Supply Agreement Fully Executed
7 passages
53 The 2024 Payment Schedule will be revised to credit NSPI for any amounts owing to 54 NSPI related to underspend from the 2020-2022 DSM Plan.
AI summary The 2024 Payment Schedule will be revised to credit NSPI for any amounts owing related to underspend from the 2020-2022 DSM Plan.
- 14 Executed and delivered this 4th day of October 2022. EfficiencyOne Nova Scotia Power Incorporated Stephen MacDonald 5826B8AAD710425 Ву: Name: Stephen MacDonald Name: Title: CEO Title: 1 SCHEDULE "A" to CONFIDENTIALITY AGREEMENT 2 3 4...
AI summary This document is a compliance filing related to EfficiencyOne's 2023-2025 DSM Plan, executed on October 4, 2022, between EfficiencyOne and Nova Scotia Power Incorporated. It includes a confidentiality agreement and an undertaking by Judith Ferguson.
2 2.1.2 OTHER EXTERNAL STAKEHOLDER ENGAGEMENT - 3 E1 conducted stakeholder engagement on the 2023-2025 DSM Plan with a variety of other external 4 stakeholder groups, illustrated in [Figure 4,](#page-62-2) below. - 6 Figure 4: Other Stakeh...
AI summary E1 conducted stakeholder engagement on the 2023-2025 DSM Plan with various external groups, as illustrated in Figure 4. The engagement involved multiple stakeholders beyond those previously mentioned.
Business, Non-Profit & Institutional (BNI) Energy Efficiency (EE) Programs Low-Income Participation e 35.2 42.8 36.5 384 6.5 1.0 0.7 1.2 0.8
AI summary The table provides an overview of investment and savings under the BNI Energy Efficiency Programs for the 2023-2025 Settlement Plan, with figures indicating participation rates and associated metrics.
ic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteristic Characteris...
AI summary The document presents a table outlining the 2023 Settlement Plan, detailing investment amounts, lifetime benefits, energy savings, and other metrics by program component. It includes columns for investment, benefits, energy savings, and cost-related data.
11 Component Investment Energy Savings Demand Savings Participation Continuing to build on the prescriptive rebate stream, introduced in the 2020-2022 DSM Plan, to help address barriers to participation for property owners with smaller (e....
AI summary The document outlines enhancements to the prescriptive rebate stream under the 2020-2022 DSM Plan, aimed at addressing participation barriers for property owners with smaller buildings. It also introduces new rebate opportunities for heat pumps and heat pump water heaters to improve heating system efficiency in affordable housing.
7.2.2 OVERVIEW - Seven in ten residents and businesses say that it is important for them to reduce their use of energy, while - four in ten still feel they need help understanding how to achieve energy savings[40](#page-171-3) , highlighti...
AI summary Seven in ten residents and businesses in Nova Scotia value reducing energy use, but four in ten need help understanding how to achieve energy savings. This highlights an opportunity for Enabling Strategies activities in the 2023 to 2025 Plan period, which will build on E1's experience and incorporate feedback from Nova Scotians, including non-participants.