Matter: CI# 38856 - P-128.10 - NSPI WO - L7011 Deteriorated Replacements - $2,055,736
10 passages 3 documents

2025 Ace Plan across all matters →

N-1Redacted Work Order 9/2/2010 6 passages
Section 592
I .J.. I , .f'i~-'E:-r~ Ctos:sir}~s ·occuf.SU·:Al ES ,c:=:ds:nrr~::::V\,·:::tec- E:tc. ! eavs a jOv.) Det·!\:::::n ;:::::~;:::;:i=te stluC:: !;-=S ~:) :2H:JVl ioenrmc:::.fion '0f :::'-ossi;;gs. Use i3v:;.se of shes: reoi"' 2dd~t~on~i CDi"n...

AI summary The text appears to be a regulatory proceeding document with a focus on energy efficiency programs and regulatory processes, though the content is partially redacted or illegible. Key elements include references to a 2010 ACE plan and a regulatory attachment.

Section 1438
ACE 2010 NSPI (UARB) Attachment 1 IR-T8 Page 59 of 105 ' . _ ._.•. .~/ .~-.-. _ ...r~:o_!.':;;:....:f..:..:\"l.....:!S,....,.::;...,.:i_::O::_f·-::_:!=t..!'-=i'.,,.,..i=~K.==_=;-=O=.r :...:.,!_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _......L_ _ _...

AI summary The text provided appears to be a fragment from a regulatory proceeding document, likely related to Nova Scotia Power (NSP) and the 2010 ACE (Annual Capacity Estimate) process. It includes a page reference and some partially obscured or illegible content, possibly containing technical or procedural details relevant to the proceeding.

Section 1465
. 1: . Date Revised: September 2, 2010 ACE 2010 NSPI (UARB) Attachment 1 IR-T8 Page 60 of 105 "

AI summary The document is an attachment from a regulatory proceeding, dated September 2, 2010, related to the Annual Capacity Estimate (ACE) 2010 for Nova Scotia Power (NSP). It appears to be part of a filing under the Integrated Resource Plan (IR-T8) and includes page 60 of a 105-page document.

Section 1499
I I. , t" I, I I l, ,/ Date Revised: September 2, 2010 ACE 2010 NSPI (UARB) Attachment 1 IR-T8 Page 61 of 105 r . -.. " "-)'-'~-'-' .~. IC:C,- I ~r'.ki Il."!::.jv~:- ,i. . I""'" I f......,I·' 'I. • • • I t,emp. I ) ' -

AI summary The text appears to be a partially redacted legal or regulatory document related to a proceeding involving Nova Scotia Power and the Annual Capacity Estimate (ACE) for 2010. It includes a page reference and a date of revision but lacks substantive content for analysis.

Section 1865
: . i I =:::;HS' NOi i :J=i!!:,J:J '::;"r ~G . , r : ! _.. _ .-._.:-. _.... _ ..._. - . i ACE 2010 NSPI (UARB) Attachment 1 IR-T8 Page 76 of 105 Date Revised: September 2, 2010 ·1 i I , , I

AI summary The document is a regulatory proceeding attachment from 2010 related to the ACE (Affordable Clean Energy) plan in Nova Scotia, focusing on utility regulatory matters. It includes pages from a submission or report, with a revision date of September 2, 2010.

Section 1891
r I I I i i I ! V, II I II I I i ! ! ." cOl.:J3dSNlf i / ~-~-. ~-' '- ._ _. ACE 2010 NSPI (UARB) Attachment 1 IR-T8 Page 78 of 105

AI summary The text appears to be a page reference from a regulatory proceeding document related to the Affordable Clean Energy (ACE) 2010 plan, involving Nova Scotia Power Inc. (NSPI) and the Utility and Rate Board (UARB). It includes an attachment and page number, suggesting it is part of a larger filing or submission.

05853Board Decision Letter 2 passages
Section 1
Mailing address Nova Scotia Utility and Review Board Office PO Box 1692, Unit "M" 3rd Floor Halifax, Nova Scotia 1601 Lower Water Street B3J 353 Halifax, Nova Scotia B3J 3P6 [email protected] 902 424-4448 t Web www.nsuarb.ca 902424-3919...

AI summary Nova Scotia Power Inc. (NSPI) has requested approval for a 2010 ACE Plan Work Order exceeding $1 million, specifically for Deteriorated Replacements (CI # 38856 - L7011) costing $2,055,736. The Nova Scotia Utility and Review Board has reviewed the request and issued Information Requests (IRs) to NSPI, with responses submitted in September and November 2010.

Section 2
's response to IRs was received as part of the application on September 2, 2010. Board staff issued further IRs on November 2, 2010, to which responses were received by the Board on November 16, 2010. The Board has considered NSPl's reques...

AI summary The Board accepted NSPI's request for $2,055,736 to replace deteriorated equipment on a 230kV circuit, noting that the project cost was $451,333 higher than the approved 2010 ACE Plan but justified by NSPI. The Board also accepted confidential portions of the work order.

05853Board Decision Letter 2 passages
By E-mail and Courier p. p. 0
By E-mail and Courier Ms. Lee Thomson-Lutz Manager, Capital Nova Scotia Power Inc. 14th Floor, Barrington Tower P.O. Box 910, Scotia Square Halifax, NS B3J 2W5 Dear Ms. Thomson-Lutz: NSPi Request for Approval of 2010 ACE Plan Work Order Gr...

AI summary Nova Scotia Power Inc. (NSPi) has requested approval from the Board for a confidential 2010 ACE Plan Work Order exceeding $1 million, specifically for Deteriorated Replacements under CI # 38856 - L7011, with the matter numbered 03511.

CI # 38856 L7011 Deteriorated Replacements $2,055,736 p. p. 0
CI # 38856 L7011 Deteriorated Replacements $2,055,736 As a part of the 2010 ACE Plan review, Board staff issued Information Requests ("IRs") related to the above project on February 5, 2010. On March 5, 2010, NSPI responded and advised tha...

AI summary The Board reviewed NSPI's request for $2,055,736 to replace deteriorated equipment on a 230kV circuit, which exceeded the original 2010 ACE Plan by $451,333. NSPI provided adequate justification for the cost increase, and the Board approved the request, accepting the project as necessary and the cost as justified.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →