DESCRIPTION: This project is for the re-insulation of 42 out of 44 rotor poles on Big Falls Unit 6's generator. The remaining two rotor poles were refurbished in 2023 and do not require additional work. The project scope also includes refu...
AI summary This project involves re-insulating 42 rotor poles on Big Falls Unit 6's generator, along with refurbishing slip rings and other components. The work is part of NS Power's long-term strategy to maintain safe and reliable water management on the Mersey River, as outlined in the Hydro Interval Plan and the 2025 ACE Plan.
Why do this project? This project is consistent with NS Power's approach to sustaining capital investments across the Mersey Hydro System as outlined in Appendix G of the 2025 ACE Plan. Operational units like Big Falls Unit 6 play a critic...
AI summary This project is part of NS Power's strategy to sustain capital investments in the Mersey Hydro System as outlined in the 2025 ACE Plan. Big Falls Unit 6 was taken offline due to damaged insulation on rotor poles, which poses risks of electrical faults and unplanned outages. Re-insulation is necessary to restore the unit's operational integrity and support water management and flood mitigation.