Reason for Variance CI 49595 HYD Tusket 1 Overhaul was listed in the 2026 ACE Plan at $5,649,954, which included the scope for this project and the generator refurbishment. Since that time, the generator scope was removed from CI 49595 and...
AI summary The reason for variance in the 2026 ACE Plan relates to the splitting of CI 49595 HYD Tusket 1 Overhaul into two separate projects, CI 49595 and CI C0040106, which resulted in a decrease of $2,633,264 from the original estimate. The overall cost of the two projects remains consistent with the 2026 ACE Plan estimate.