Matter: EfficiencyOne - 2026 Q1 Demand Side Management (DSM) Report
6 passages 2 documents

2026 DSM Extension across all matters →

E-1Q1 2026 DSM Report 5 passages
Preamble p. pp. 4-33
October 4, 2022 (the NSUARB approved the 2023-2025 DSM Plan on November 8, 2022); and M12249, 2026 DSM Extension Application (the Nova Scotia Energy Board approved the 2026 DSM Extension on December 22, 2025) Nova Scotia Energy Board appro...

AI summary The NSUARB approved the 2023-2025 DSM Plan in November 2022, and the Nova Scotia Energy Board approved the 2026 DSM Extension on December 22, 2025. The text includes references to matter numbers and dates of approval.

2.2 2026 Mid-course adjustment p. pp. 4-6
2.2 2026 Mid-course adjustment - 26 E1's mid-course adjustment projects that E1 will achieve 109.6 GWh of energy savings, 21.6 MW - of net peak demand savings, 15.7 MW of available capacity, and 4.8 GWh of net energy savings applicable to...

AI summary E1's 2026 mid-course adjustment projects 109.6 GWh energy savings and 21.6 MW peak demand savings, with investments of $62.8 million across affordable housing and Mi'kmaw programs. These figures are slightly lower than the 2026 Plan as Approved, reflecting E1's management of 2023-2026 DSM Plan targets as the final year approaches.

3.1 Participation p. p. 8
3.1 Participation - Q1 participation results are provided in [Table 3](#page-9-1) as compared to the projected participation - uptake in the 2026 Plan as Approved. Results provide insight into current trends within program - components. -...

AI summary Q1 participation in programs like Affordable Single-family Homes and Home Energy Assessment exceeded projections due to project management changes and federal grant completion. Custom program participation remained low, while BNI Demand Response participation fell short of targets, though Residential Demand Response exceeded expectations.

1 2.1.4 Unmetered p. p. 33
1 2.1.4 Unmetered - 2 The unmetered rate class had a small amount of participation in 2022 and no participation in - 3 E1's programs over the last three years. As a result, a small amount of participation was assumed - 4 in the 2026 Plan (...

AI summary The unmetered rate class showed minimal participation in E1's programs over three years, leading to assumptions in the 2026 Plan (based on 2022-2024 data) and a mid-course adjustment assuming no participation (based on 2023-2025 data). This highlights challenges in DSM planning and program engagement.

1 Table 3: 2026 Plan and Mid-course adjustment allocations by energy savings, demand savings, p. p. 33
1 Table 3: 2026 Plan and Mid-course adjustment allocations by energy savings, demand savings,

AI summary The table outlines 2026 Plan and Mid-course Adjustment (MCA) allocations for energy and demand savings, though specific data or analysis within the chunk is not provided.

E-2E1 (NSEB) RIR 1 to 3 1 passage
IN THE MATTER OF: p. p. 4
IN THE MATTER OF: EfficiencyOne 2026 Q1 Demand Side Management Report

AI summary The document is the EfficiencyOne 2026 Q1 Demand Side Management Report, which outlines the status and performance of demand-side management initiatives during the first quarter of 2026.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →