Matter: P-188 - NSPI Regulation 3.6 - Net Metering - Request approval of the revised Regulation 3.6Enhanced net metering service, in compliance with recent legislative changes to the Electricity Act.
4 passages 3 documents

Advanced Metering Infrastructure across all matters →

N-1Letter, Application and Evidence filed by NSPI 11/1/2010 2 passages
3.6.5 Metering p. pp. 21-27
3.6.5 Metering a) Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions as approved by Measurement Canada. If the eligible customer-generator's existing electrical m...

AI summary The section outlines requirements for net energy metering, specifying that a single meter approved by Measurement Canada must be used to measure bi-directional electricity flow. If a customer-generator's existing meter is not suitable, they are responsible for covering the incremental costs of a new meter.

3.6 NET METERING SERVICE p. p. 21
3.6 NET METERING SERVICE - i. If NSPI determines that the flow of electricity in both directions cannot be reliably or safely determined through use of a single meter, NSPI may require that separate meters be installed. Such metering will...

AI summary NSPI may require separate meters if bi-directional electricity flow cannot be reliably measured with a single meter, and for Class 2 Net Metering, an additional metering system is required to measure the generator's output, with costs borne by the customer.

06870Board Order 1 passage
3.6.5 Metering p. p. 2
3.6.5 Metering - a) Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions as approved by Measurement Canada. Ifthe eligible customer-generator's existing electrical...

AI summary The regulation outlines requirements for net energy metering, specifying the use of a single bi-directional meter approved by Measurement Canada. If a customer-generator's existing meter is not suitable, they must bear the cost of upgrading or installing new meters as determined by NSPI.

06691Revised Regulation 3.6 - Red-lined Copy 3/31/2011 1 passage
3.6.5 Metering
3.6.5 Metering - a) Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions as approved by Measurement Canada. If the eligible customer-generator's existing electrical...

AI summary The section outlines requirements for net energy metering, specifying that a single, approved meter must be used to measure bidirectional electricity flow. If a customer's existing meter is not suitable, they are responsible for associated costs. NSPI may require separate meters if a single meter cannot reliably or safely measure both directions of flow, with the customer bearing the cost.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →