Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
6 passages 4 documents

Advanced Metering Infrastructure across all matters →

N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB) 1 passage
PRIMARY VOLTAGE METERING AND DELIVERY ADJUSTMENTS:
PRIMARY VOLTAGE METERING AND DELIVERY ADJUSTMENTS: The above monthly charges are applicable without adjustment for voltage when delivery and metering are at Company's standard secondary voltage. Metering: For so long as metering voltage is...

AI summary The document outlines specific adjustments to monthly charges based on primary voltage levels for metering and delivery. Charges remain unadjusted at standard secondary voltage. For metering and delivery at primary distribution voltages of 11 kV or greater, a 1.0% reduction applies to metering charges, and a reduction of 30¢ per kW of load size applies to delivery charges. Additionally, a High Voltage Charge of $60 per month is imposed for deliveries metered at the delivery voltage.

57968Amended Board Order (and attached Schedules A to C) 2 passages
SPECIAL CONDITIONS:
SPECIAL CONDITIONS: (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a cap...

AI summary The special conditions outline requirements for metering and service provisions. Customers requiring primary metering must contribute to the additional cost, and meter readings on the high voltage side will be adjusted by 1.75%. Non-standard service provisions may require customers to own transformers typically provided by the company.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) At the option of the Company, supply may be at distribution voltage. Meter readings shall be increased by 1.75% for each transformation between the meter and the low voltage side of the bulk power supply transform...

AI summary The document outlines special conditions for metering and tariff availability under a Nova Scotia utility tariff. It includes adjustments for transformer losses, capital contributions for primary metering, and criteria for withdrawing tariff availability based on customer demand and cost reduction.

57968Amended Board Order (and attached Schedules A to C) 2 passages
SPECIAL CONDITIONS:
SPECIAL CONDITIONS: (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a cap...

AI summary The special conditions outline the metering requirements for the customer, specifying that primary metering may require a capital contribution from the customer. Adjustments to metered kWh usage are outlined based on the voltage level of the substation.

Preamble
Metering will normally be at the low side of the transformer and, for billing purposes, meter readings will be increased by 1.75%. Should the customer's requirements make it necessary for the Company to provide primary metering, the custom...

AI summary The document outlines metering requirements, specifying that metering is typically at the low side of the transformer with a 1.75% increase in readings for billing. If primary metering is required, the customer must cover the additional cost as a capital contribution.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 1 passage
Preamble
Metering will normally be at the low side of the transformer and, for billing purposes, meter readings will be increased by 1.75%. Should the customer's requirements make it necessary for the Company to provide primary metering, the custom...

AI summary The document outlines metering requirements, specifying that metering is typically at the low side of the transformer with a 1.75% increase in readings for billing. If primary metering is required, the customer must pay the additional cost as a capital contribution.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →