Topic/Matter Intersection

Topic:"Advanced Metering Infrastructure" in M12696

Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
1 passage 1 document

Advanced Metering Infrastructure across all matters →

N-4NSPML (IG) RIRs 1-26 - Redacted 1 passage
Article 7. Metering p. pp. 113-114
Article 7. Metering - 7.1 General. Each Party shall comply with the Electric Reliability Organization requirements. Unless otherwise agreed by the Parties, Transmission Provider shall install Metering Equipment at the Point of Interconnect...

AI summary Article 7 outlines metering requirements for the Large Generating Facility, specifying Transmission Provider's obligation to install, maintain, and test revenue-quality metering equipment per ANSI standards. Interconnection Customer may install check meters at its expense, with testing procedures and data telemetering responsibilities defined. Adjustments for inaccurate metering are mandated, with cost allocation depending on fault attribution.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →