Matter: Nova Scotia Power Inc. - Application for Financing Order authorizing the Securitization of $1 billion in costs, collected through a Securitization Cost Recovery Rider
3 passages 1 document

Advanced Metering Infrastructure across all matters →

N-1Application - Redacted 3 passages
SPECIAL CONDITIONS p. pp. 83-197
SPECIAL CONDITIONS (1) Metering will normally be at the low voltage side of the bulk power transformer. At the option of the Company, supply may be at distribution voltage. Meter readings shall be increased by 1.1% for each transformation...

AI summary The special conditions specify metering requirements, including adjustments for transformer losses based on the voltage level at which metering occurs. Meter readings are adjusted by 1.1% per transformation when metering is at distribution voltage and reduced when at transmission voltage.

Preamble p. pp. 60-83
- (a) The customer must commence service under this tariff on November 1st, unless NSPI grants a waiver. - (b) The customer must be equipped with a standard Smart Meter. - (c) NSPI may limit the number of customers who may subscribe to thi...

AI summary This section outlines the conditions for customers to subscribe to a specific tariff, including requirements to start service on November 1st, the need for a Smart Meter, and restrictions on seasonal and net metering services.

AVAILABILITY p. p. 83
AVAILABILITY This tariff is applicable to three phase electric power and energy, supplied at the low voltage side of the bulk power transformer, to municipal electric utilities. Meter readings shall be increased by 1.1% for each transforma...

AI summary The tariff applies to three-phase electric power and energy supplied to municipal electric utilities at the low voltage side of the bulk power transformer. Meter readings are adjusted by 1.1% for each transformation between the meter and the low voltage side to account for transformation losses, and readings are reduced when metering occurs at transmission voltage.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →