Topic/Matter Intersection

Topic:"Affiliate Transactions" in M12768

Matter: Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report
3 passages 1 document

Affiliate Transactions across all matters →

N-3NSPI (IG) RIR 1 to 15 - Redacted 3 passages
REDACTED p. p. 13
REDACTED 1 Request IR-8: 2 3 Reference: 2025 Annual Report, Exhibit N-1, p. 5/9 – Schedule Deviations (Cause Code 5, 4 "PDN") and Off-schedule Details, p. 3/3 5 6 (a) Please describe in detail the methodology used to calculate the $706,609...

AI summary The text outlines a request (IR-8) for detailed information on the methodology used to calculate a $706,609 system cost attributed to PDN deviations in 2025, the nature of the figure, and the allocation of costs between FAM customers and PHP. It also requests an explanation of column headings and a footnote, and a total of shaded columns.

REDACTED p. p. 13
REDACTED 1 • Hourly Off-Schedule Charge = (PortOps modeled cost to serve x PHP load) - (CBL 2 Energy Charge x PHP load) 3 4 (b) The Off-Schedule Charge is neither a cost to customers (as PHP pays for its incremental 5 cost to serve) nor a...

AI summary The document discusses the Off-Schedule Charge under the ELIADC Tariff, explaining its role as an incentive for PHP to follow dispatch and its calculation based on the difference between metered and expected loads. It references the ADC Load Shifting Differential and its connection to the ELIADC Tariff and a 2025 report.

10 Recommendation XV-3 p. p. 13
10 Recommendation XV-3 11 12 However, in its efforts to provide useful and meaningful quantifications, NS Power 13 continued to pursue and, in the 2025 ELIADC Tariff Annual Report, has provided more 14 data and metrics and has additionally...

AI summary NS Power has been working to provide more detailed quantifications of the benefits of ADC load shifting in the 2025 ELIADC Tariff Annual Report. Due to a cyber incident, modelling for 2025 was paused, but data collection and model testing have resumed following the restoration of PortOps. NS Power plans to present the modelling outputs by Q2 2025.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →