Matter: Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405
4 passages 2 documents

Affordability across all matters →

N-2NSPI (NSEB) RIRs 1-11 3 passages
26. Cooling Water Management p. p. 3
26. Cooling Water Management - a. The Approval Holder(s) shall continuously monitor temperature at the condenser inlet and outlet for all units and record the maximum daily temperature at the condenser inlet and outlet for all units. This...

AI summary This section outlines requirements for cooling water management, including temperature monitoring, risk mitigation strategies for sponge ball loss, and measures to protect aquatic life. Chlorination for biofouling control is explicitly prohibited.

4.9 Ash Reclamation p. p. 151
4.9 Ash Reclamation Ash recovery from uncapped cells for offsite use may occur. This will require excavation of existing ash and trucking to an offsite location. Capping material will be removed as needed. Ash will normally contain 10-20%...

AI summary The document outlines the process for ash reclamation from uncapped cells for offsite use, including moisture management, dust control, and transportation requirements to ensure compliance with environmental and safety standards.

6.9.4 Export Ash Sampling p. pp. 165-166
6.9.4 Export Ash Sampling ASTM 618 requires sampling of ship-loaded (export) ash as this will be the final point of NSPI possession before product is supplied to customers. This sampling is to be completed by third-party contractor. It ser...

AI summary ASTM 618 requires third-party sampling of export ash to ensure quality control and record-keeping for NSPI. Moisture testing is essential to confirm the correct quality of ash delivered to customers, as water content may fluctuate during transport.

98615NSEB (NSPI) IR-1 to IR-11 1 passage
Request IR-5:
Request IR-5: - Page 2 of the application states: "Following installation, surface runoff from the capped area will be monitored in accordance with the Department's regulatory standards. Upon verification that water quality meets the appli...

AI summary The document requests clarification on the verification and management of surface runoff water quality post-installation, including cost implications and responsibilities if water quality standards are not met.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →