Topic:"Affordability" in M12829

Matter: NSPI DRO Appeal - Meter and Billing Issues - Jaspal SinghLinked to query Q05333
2 passages 2 documents

Affordability across all matters →

S-4NSPI Response to Appeal (redacted) 1 passage
REDACTED p. p. 2
rue read and the bill was the reconciliation bill. The peak billed 2-month winter usage at the subject premises was 8892 kWh's. This occurred during the December 2024 to February 2025 billing period. It is NS Power's position that the cust...

AI summary NS Power asserts the customer was billed correctly for high winter usage (8892 kWh). The DRO requested meter testing (Regulation 5.5) after learning the customer uses baseboard heating. NS Power provided account details and offers payment plans. The case references Confidential Attachment 1 (pages 6-10).

S-6NSPI (NSEB) RIR-1 to RIR-3 (redacted) 1 passage
REDACTED
REDACTED 1 for a 10-year certification period. Based on NS Power's meter certification 2 schedule, meter #2567965 is not due for recertification testing until April 2, 2035. 3 4 (g) NS Power can generally arrange for a meter to be removed...

AI summary The text discusses the recertification schedule for a specific meter, noting that it is not due for testing until 2035. It also outlines the timeframes for meter removal, submission for testing, and reporting of results. Additionally, it references a regulatory proceeding involving NSPI and the NSEB.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →