N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010
2 passages
Schedule D Alternate Compliance Methods for Existing Buildings No. Code Requirement Alternate Compliance Method Date Filed: July 15 2010 property line, and (d) no alternate access to an entrance from a street or public way is possible; (Se...
AI summary The document outlines alternate compliance methods for existing buildings under Schedule D, particularly for mechanical systems in Parts 6 and 7. It states that existing mechanical systems do not need to fully comply with these parts if they are not unsafe and are acceptable to the authority having jurisdiction.
5.8 PAINT Shop paint structural steel, piping and architectural in accordance with NSPI standards.
AI summary The text specifies that shop paint for structural steel, piping, and architectural elements must comply with NSPI standards.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →