N-6NSPI (NSUARB) RIR-1 to 13 - Redacted
3 passages
REDACTED 1 (d) The revised costs associated with archaeological assessment are a result of ongoing 2 collaboration with the Mi'kmaq of Nova Scotia on hydro capital refurbishment projects, 3 changing expectations for archaeological protecti...
AI summary The text discusses revised archaeological assessment costs due to collaboration with the Mi'kmaq of Nova Scotia and lessons from recent hydro projects. It also notes that the selected contractor did not include rental costs for trailers and generators in their bid, which must now be added. The text references the 2019 ACE Plan Application and requests information on the tendering process for the project.
CI 50518 NSUARB IR-12 Attachment 10 Page 530 of 591 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Estimated cost: Based on our 2016-2018 project in this area, we would estimate the total cost of completing this work to be approx. $125,000 +...
AI summary The text outlines estimated costs for a habitat restoration project, including contractor fees, consultant costs, and NSSA coordination expenses. It also provides the site location and mentions the involvement of local Mi'kmaw community members in monitoring.
CI 50518 NSUIARB IR-12 Attachment 12 Page 440 of 576 REDACTED (CONFIDENTIAL INFORMATION REMOVED) A B C D E F63 BMP - Wildlife Fences, observation blinds, platforms, paved trails, exclusion periods, and/or well-enforced prohibitions on moto...
AI summary The table outlines various environmental and wildlife management considerations, including BMPs for wildlife protection, consumptive uses within an Area of Assessment, and proximity of domestic wells to the area. It includes checks for the presence of specific habitat types and consumptive activities.
N-9Amended Evidence - Midgard - Redacted
6 passages
5.4.1 NS Power Submission - NS Power reported consulting cost increases from the 2019 ACE to the ATO Application as detailed in [Table](#page-40-0) - [19](#page-40-0) an[d Table 20,](#page-40-1) which resulted in consulting expense overspe...
AI summary NS Power reported consulting cost increases from the 2019 ACE to the ATO Application, resulting in an overspending of $1,630,672 as detailed in tables referenced in the submission.
Table 19: 2019 ACE Application Costs – Consulting[64](#page-40-2) Description Total Estimate ($) Design $142,281 RFP Support $6,000 Construction Support $17,500 Environmental $4,780 KMKNO Capacity Payments XXXXXXX TOTAL: XXXXXXXX Table 20:...
AI summary The text presents two tables detailing the estimated consulting costs for the 2019 Affordable Clean Energy (ACE) Application and the ATO Application. The tables include line items such as design, environmental studies, and monitoring activities. The ACE table includes a total estimate of XXXXXXXX, while the ATO table has a total estimate of $1,877,234.
5 5.5.1 NS Power Submission - 6 NS Power did not report "Mi'kmaw Engagement" as a separate cost category in the 2019 ACE, however it did - 7 include XXXXXXX for "KMKNO Capacity Payments". The Mi'kmaw engagement costs given in the ATO - 8 A...
AI summary NS Power did not report 'Mi'kmaw Engagement' as a separate cost category in the 2019 ACE but included 'KMKNO Capacity Payments' instead. The Mi'kmaw engagement costs in the ATO Application are detailed in Table 21.
Table 21: ATO Application Mi'kmaw Engagement Costs[67](#page-42-2) Description Total Estimate ($) KMKNO capacity agreement payments XXXXXXXX Mi-kmaq observer during construction XXXXXXXX TOTAL: XXXXXXXX - 10 In response to IRs, NS Power in...
AI summary The text discusses the increase in Mi'Kmaq engagement costs under the ATO application, as indicated by NS Power in response to IRs. Table 21 outlines various costs related to Mi'kmaw engagement, including capacity agreement payments and observer roles during construction.
15 5.6.1 NS Power Submission - 16 NS Power reported AO cost increases from the 2019 ACE to the ATO Application as detailed i[n Table 23](#page-43-0) and - 17 [Table 24,](#page-43-1) which resulted in administrative overhead expense overspe...
AI summary NS Power reported increased administrative overhead expenses due to cost increases from the 2019 ACE to the ATO Application, resulting in an overspending of $627,515.
Table 23: 2019 ACE Administrative Overhead Costs[69](#page-43-2) Description Total Estimate ($) Labour AO $72,085 Contractor AO $438,973 TOTAL: $511,058 Table 24: ATO Application Administrative Overhead Costs[70](#page-43-3) Description To...
AI summary The text presents two tables detailing administrative overhead costs for the 2019 ACE and ATO application processes, including labour and contractor costs. The tables are referenced by matter numbers and exhibits from regulatory proceedings.