NON-CONFIDENTIAL ACE 2026 D004 ($) D061 ($) D062 ($) Total 2025 Q3 Forecast Pre-Overheads 14,994,038 27,706,072 9,782,173 Inflation at 1.8% 269,893 498,709 176,079 Administrative Overheads 4,020,005 7,858,317 2,369,819 Total Budget 19,283,...
AI summary The document presents a budget forecast for ACE 2026, including pre-overheads, inflation adjustments, and administrative overheads, resulting in a total budget of $19,283,936 for D004, $36,063,099 for D061, and $12,328,071 for D062.
7 Year SAIDI All-In SAIDI MED Excluded Resilience Gap 2021 5.60 5.60 0.00 2022 74.87 6.11 68.76 2023 23.03 5.82 17.21 2024 6.34 6.34 0.00 2025 10.19 5.90 4.29 1 Request IR-49: 2 3 Directives & Misc pages 87 to 141 4 5 Section 11.1.4 Impact...
AI summary The text discusses the status of a residential Value of Lost Load (VoLL) survey conducted by NS Power as part of the 2026 ACE Plan application. The survey was distributed to residential customers, and analysis is underway with a draft report expected by late 2025. The final report is anticipated in Q1 2026, and summary findings will be shared at that time.
Brief Overview of Company Company Name: Dexter Construction Company Limited 927 Rocky Lake Drive, PO Box 48100 Bedford, Nova Scotia B4A 3Z2 Phone: (902) 835-3381 Length of Time in Business: 64 Years Dexter Construction Company Limited (Dex...
AI summary This document provides a brief overview of Dexter Construction Company Limited, highlighting its 64 years in business, areas of expertise, and experience working with Nova Scotia Power Inc. (NSPI) and other industrial clients. It also mentions the use of Connors Diving Services Ltd. as a subcontractor.
Experience Rating for 2024 is calculated using injury and payroll data from the years 2020 to 2022. The 3-year costs and payroll are determined, and costs are weighted so that the more recent experience has more impact on rates. The key me...
AI summary The 2024 Experience Rating is calculated using injury and payroll data from 2020 to 2022, with more recent data having a greater impact. A cost ratio is used to determine the Experience Rating, and the result is a -28.36% merit adjustment of $-0.92. The document also references the 2026 ACE Plan and a Request for Proposal (RFP) related to a shoreline revetment project.