Matter: Nova Scotia Power Inc. - 2026 Annual Capital Expenditure (ACE) Plan - $284 million
4 passages 3 documents

Appliance Standards across all matters →

N-1Application - Redacted 1 passage
Section 232
10.00 0.00 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 NS Power Atlantic Utilities 2 3 4 Figure 61 and Figure 62 below represent NS Power’s reliability statistics with Major and Extreme 5 Events (such as Hurricanes Dorian, Fiona, and...

AI summary The document discusses NS Power’s reliability statistics, showing improvements in SAIFI and SAIDI metrics due to reduced severe weather events and effective outage prevention initiatives. It also mentions the 2026 ACE Plan, which is marked as confidential.

N-22Responses to Undertakings 1-22 2 passages
SITE ASSESSMENT & TIER I/II TABLE CHECKLIST p. p. 56
aracteristics obtained (e.g., stories, floor condition, ceiling

AI summary The text provides a partial table header related to a site assessment, indicating that characteristics such as stories, floor condition, and ceiling are being recorded. The context suggests this is part of an environmental site assessment process.

Section 554 p. pp. 149-150
BH/MW6 VAV PROJECT: Phase III ESA - 116 Ruth Falls Rd., Sheet Harbour, NS DRILLING DATE: December 12, 2024 DRILLER: Q-Drilling DRILL TYPE: CME-45 ELEVATION DATUM: Assumed DRILLING METHOD: Auger & Case/Core

AI summary This document provides details about a Phase III Environmental Site Assessment (ESA) project at 116 Ruth Falls Rd., Sheet Harbour, NS. It includes the drilling date, driller, drill type, elevation datum, and drilling method used for the project.

102222Closing Submissions - NSPI 1 passage
4.0 REPORTING ON TREE CONTACTS p. pp. 15-16
rse and non-adverse weather conditions, by increasing the separation between tree lines and power lines. As confirmed in response to CA IR-24(d), the 40% estimate continues to be validated through the experience and assessment of NS Power'...

AI summary NS Power discusses its methodology for estimating tree contact risks, validated by subject matter experts and field reviews. It acknowledges the 40% estimate remains reasonable and will continue to refine it as the vegetation management program evolves. The document references the 2026 ACE Plan Hearing Transcript and related exhibits.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →