Matter: CI# 28098 - P-128.07 - NSPI WO -  Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
2 passages 2 documents

Asset Management across all matters →

N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010 1 passage
NON-CONFIDENTIAL p. p. 213
NON-CONFIDENTIAL 1 Response IR-15: (cont'd) 2 3 f) The original design was based on modeling software using engineering principals and 4 provided full operating range for the plant. The modeling identified a need to limit 5 CW cooling for...

AI summary The response discusses the original design of a plant based on engineering models and the need to limit cooling water (CW) pump usage under minimum load conditions. It also notes that detailed engineering using OEM data indicated a split design would be more suitable for the operating conditions.

N-7NSPI Reply Submission 8/6/2010 1 passage
Condenser p. p. 0
Condenser Condenser specification involves matching its operating performance, (i.e. temperature and backpressure) to the turbine as well as taking into consideration long-term maintenance aspects such as cathodic protection, protective co...

AI summary NSPI's condenser design for a thermal generation project involves balancing seawater cooling efficiency with technical challenges, including higher backpressure requirements, elevated condenser positioning, and cost implications. The design includes a divided waterbox for maintenance flexibility and references UARB IR-14 for technical correspondence.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →