Matter: CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders  in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project
16 passages 3 documents

Asset Management across all matters →

N-1Application 9 passages
1 7.0 PROJECT DEVELOPMENT ACTIVITIES TO DATE 2 3 The purchase of the Project from 324 NSL was completed on May 28, 2010. The purchase 4 agreements are provided in Appendices 3 and 12. Given the nature of ownership and control of 5 this development, various parties have undertaken aspects of its development over time. The 6 following activities have been completed or are currently ongoing: 7 8 NSPI Project Asset Verification: The determination and verification of assets at 9 the point of transfer from 324 NSL to NSPI. 10 Lease and Easements Acquisition for Transmission and Project Site: There are 31 11 properties considered for lease for the wind farm. The final transmission route 12 requires access to 56 properties. 13 Turbine Site Plan: A site plan illustrating the final turbine locations is provided in 14 Appendix 14. 15 Design and Construction of the 17 km transmission line from the Project site to 16 the Conway Substation. 17 Completion and Assignment of: 18 Generation Interconnection Agreement 19 Environmental Assessment Approval 20 Environmental Protection Plan 21 ecoENERGY Contribution Agreement 22 Turbing Supply Agreement with General Electric 23 Purchase Order for Magna Transformer 24 Engineering, Procurement and Construction (EPC) Contract with Emera 25 Utility Services 26 Notice requirements under leases and Services Agreement with Scotian p. p. 17
1 7.0 PROJECT DEVELOPMENT ACTIVITIES TO DATE 2 3 The purchase of the Project from 324 NSL was completed on May 28, 2010. The purchase 4 agreements are provided in Appendices 3 and 12. Given the nature of ownership and control of 5 this dev...

AI summary The Project was purchased by NSPI from 324 NSL in 2010. Key activities include asset verification, lease acquisitions for 31 wind farm properties and 56 transmission route properties, turbine site planning, transmission line construction, and completion of agreements like the Generation Interconnection Agreement, Environmental Assessment Approval, and EPC Contract with Emera.

WHEREAS: p. p. 62
WHEREAS: - (a) The Company has been actively pursuing the development of a wind energy facility to be constructed near Digby, Nova Scotia (the "Project"); - (b) The Company owns and has certain personal property, rights in and to real prop...

AI summary The document outlines a sale agreement for a wind energy facility near Digby, Nova Scotia, involving the transfer of assets from the Company (Nova Scotia Power Inc.) to a Purchaser. Key terms include payment for development costs and compliance with the Income Tax Act (Canada).

ARTICLES COVENANTS ARTICLES COVENANTS p. p. 62
- (d) To maintain throughout the License Telli, at its own expense, insurance on the Licensed Assets and the Project to the satisfaction of the Licensor and with the Licensor named as an additional insured or loss payee as applicable. All...

AI summary The text outlines obligations for the Licensee to maintain insurance on licensed assets and the project, comply with laws, and ensure good repair. The Licensor retains rights to perform repairs at the Licensee's expense if maintenance is neglected. Insurance requirements include 30-day notice for policy changes and certificate provision.

ARTICLE 6 OPTION ARTICLE 6 OPTION p. p. 62
ssets acquired by the Licensor relating to the Project after the Effective Date; - (ii) all lending, banking, interest, prepayment and breakage costs incurred by the Licensor in relation to the Project or as a result of any payments to any...

AI summary The document outlines terms for asset transfer under an option agreement, including the Licensee's obligation to pay the Option Purchase Price via certified cheque or promissory note, and the Licensor's responsibility to assist with third-party consents for asset transfer. It details costs related to lending, professional services, and asset acquisition post-Effective Date.

C. Non-Land Assets Acquired through Scotian Windfields Inc. and Scotian Windfields Parnters Corp. p. p. 62
C. Non-Land Assets Acquired through Scotian Windfields Inc. and Scotian Windfields Parnters Corp. Asset/Document Parties Date Building Permit No. 7378 BUilding Permit No. 7378 Re Re PID 30167829 PID 30167829 Municipality and Town of Munici...

AI summary The document lists several building permits issued by the Municipality and Town of Digby between February and July 2009, associated with assets acquired through Scotian Windfields Inc. and Scotian Windfields Partners Corp.

3. Conveyance p. p. 62
3. Conveyance The Vendor hereby sells, assigns, transfers, conveys and delivers to the Purchaser, and the Purchaser hereby acquires and accepts effective as of the Closing Time all of the right, title and interest of the Vendor in and to e...

AI summary The Vendor transfers all rights, title, and interest in the Assets listed in Schedule 'A' of the Purchase Agreement to the Purchaser, free from Liens or encumbrances, effective at the Closing Time.

A. Assets Acquired by 3240384 Nova Scotia Limited since December 23, 2009: p. p. 62
A. Assets Acquired by 3240384 Nova Scotia Limited since December 23, 2009: and process of the formation of the The state of the state of the state of the state of the state of the state of the state of the state of the state of the state o...

AI summary The document section lists assets acquired by 3240384 Nova Scotia Limited since December 23, 2009, but the content is incomplete and contains a repetitive phrase that appears to be a formatting error.

E. Non-Land Assets Acquired through Interwind Corp. (formerly SkyPower Corp.): p. p. 62
E. Non-Land Assets Acquired through Interwind Corp. (formerly SkyPower Corp.): The same and the same and the same and the same and the same and the same and the same and the same and the same and the same and the same and the same and the...

AI summary This section discusses non-land assets acquired through Interwind Corp., formerly SkyPower Corp. However, the content is incomplete and repetitive, making it difficult to extract meaningful information.

BETWEEN: p. p. 62
BETWEEN: 3240384 NOVA SCOTIA LIMITED , a body corporate, incorporated under the laws of the Province of Nova Scotia (the "Assignor") - and - NOVA SCOTIA POWER INCORPORATED , a body corporate, incorporated under the laws of the Province of...

AI summary This legal agreement outlines the assignment of leases from 3240384 NOVA SCOTIA LIMITED (Assignor) to NOVA SCOTIA POWER INCORPORATED (Assignee) under a Purchase Agreement dated May 28, 2010. The Assignee assumes responsibility for the Leases as of the Effective Date, with the transaction governed by mutual covenants.

N-3-(a)Redacted NSPI Response to UARB IR-1 to IR-12 (att 2) 2 passages
Schedule B - Purchased Assets p. p. 106
Schedule B - Purchased Assets ( ( I All of the shares in the capital stock of Scotian Windfield Pal'tners Corp. legally or beneficially own:ed by SkyPower Corp. Schedule B continued on next page

AI summary Schedule B outlines the transfer of ownership of Scotian Windfield Partners Corp. shares to SkyPower Corp. The schedule is continued on the following page, indicating additional details may be provided in subsequent sections.

NON-CONFIDENTIAL p. p. 24
NON-CONFIDENTIAL 1 Request IR-8: 2 3 Reference Appendix 4, Asset Purchase Agreement 4 5 Schedule A, Page 24 of 50 lists an Agreement dated December, 2009 between Scotian 6 Windfields Inc. and 3240384 Nova Scotia Limited. Please provide a c...

AI summary The text contains requests and responses related to the provision of specific agreements and details about a power project. Request IR-8 asks for a copy of an asset purchase agreement, while Request IR-9 asks for the Project Description and details about the Point of Isolation and Point of Interconnection. Responses reference attachments and provide locations for these points.

N-3-(b)Redacted NSPI Response to UARB IR-12 (att 7-10) to IR-17 5 passages
Table 2.2 Typical Project Activities p. p. 24
Table 2.2 Typical Project Activities Site Preparation and Construction Clean-up and reclamation Construction waste will be removed and disposed of at an approved location in accordance with local and provincial waste management requirement...

AI summary The document outlines typical project activities during the construction, operation, and decommissioning phases of a wind energy project, including site preparation, turbine commissioning, maintenance procedures, and decommissioning processes. It emphasizes compliance with environmental and regulatory standards throughout the project lifecycle.

2.6.2 Operation and Maintenance Activities p. p. 24
2.6.2 Operation and Maintenance Activities Activities associated with the operation and maintenance of the Digby Wind Power Project will not be as extensive as during the construction phase. Maintenance inspections are required approximate...

AI summary Operation and maintenance of the Digby Wind Power Project involve monthly inspections, use of light-duty vehicles for access, and a SCADA system for monitoring. Lubricants are managed per regulations without PCBs, and waste is minimized. Larger equipment is used infrequently for repairs.

Renewable Energy Asset Map, 2008, Cape Breton, NS (Research Analyst) p. p. 101
Renewable Energy Asset Map, 2008, Cape Breton, NS (Research Analyst) As a research analyst on this project for a regional planning commission, provided research and analysis on the biophysical and economic potential for renewable resource...

AI summary A research analyst conducted a study on Cape Breton's renewable energy potential, including literature reviews, expert consultations, GIS mapping, and workshop development to assess biophysical and economic opportunities for renewable resource development in the region.

SECTIONS p. p. 3
SECTIONS - 1.2 RELATED .1 Section 01 10 00 General Requirements. - .2 Section 01 91 13 Commissioning (Cx) Requirements. - .3 Section 01 91 41 Commissioning Training. - .4 Appendix A1 Commissioning Forms. - 1.3 INSTALLATION/ .1 Include the...

AI summary This section outlines commissioning requirements, including installation and start-up checklists, training, and forms. It emphasizes the use of standardized checklists by installers and the role of the Owner's Representative in providing project-specific commissioning forms.

- .4 After tree supports have been installed, prune and remove broken branches with clean, sharp tools. p. p. 160
- .4 After tree supports have been installed, prune and remove broken branches with clean, sharp tools. STANDARD SPECIFICATIONS FOR MUNICIPAL SERVICES PLANTING OF TREES, SECTION 32 90 00 SHRUBS AND GROUNDCOVER PAGE 7 JANUARY 2009 3.7 Maint...

AI summary This section outlines maintenance procedures for trees and shrubs during the establishment period, including watering, weeding, pruning, mulch maintenance, pesticide application, and plant replacement. It also addresses situations where pesticide use may be restricted by local bylaws.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →