REDACTED 1 Transmission Responses 2 3 Request IR-T6: 4 5 With respect to page 195, GI# 38857 - L7004 Deteriorated Replacements, 6 7 a) Provide a copy of the studies and reports that lead to the decision to do this work. 8 9 b) Please descr...
AI summary The text outlines a series of requests related to transmission infrastructure work, including the need for studies, line details, reasons for replacement, project timelines, and engineering information. These requests aim to clarify the scope, necessity, and planning of the work.
6 Account Total ($) ment m Co no change pole grounds have to be re-stapled 2010 the old # 3 aircraft # re-staple ground wire at move m of both poles Insulators the same as m last Inspection Also re me scheduled 2010 no change fro last ti b...
AI summary The text contains a table with various maintenance and inspection details for electrical poles, including ground clearance measurements, inspection dates, and recommendations for repairs. It outlines issues such as broken insulators, missing staples, and ground wire replacements.