Low Temperature Superheater (L TSH): Tube, tube bend and shield upgrades - $350,000 The quantity of tubes, tube bends and shields to be replaced was confirmed during the detailed inspections during the Unit 1 outage in 2010. Tubes and tube...
AI summary The document outlines various boiler refurbishment projects at Lingan 1, including upgrades to the Low Temperature Superheater, High Temperature Superheater, and the Back Pass Division Wall. These projects aim to mitigate risks of tube failures, improve tube protection, and ensure compliance with ASME specifications.