Matter: P-194 - Nova Scotia Power Inc. - 10-Year System Outlook Report - 2022
4 passages 1 document

Asset Management across all matters →

N-1Report 4 passages
Section 47
1 Due to the recent (February 2022) forced outage at Brooklyn Power (Section 3.2.3), coupled with 2 the Wreck Cove LEM project scheduled outages and ongoing commissioning work on the 3 Labrador Island Link, Lingan Unit 2 will be available,...

AI summary Due to recent outages and maintenance at Brooklyn Power and the Wreck Cove LEM project, Lingan Unit 2 will be available to provide firm capacity for the 2022/2023 winter. NS Power has applied to the NSUARB for approval of the accounting treatment of the Annapolis Tidal Generating Station's unrecovered net book value, but the NSUARB has held the application in abeyance and requested a decommissioning application.

Section 67
1 • Asset health is a critical operating parameter to keep at the forefront of all asset 2 management decisions. For example, asset health may determine if a unit is capable of 3 two-shifting (unit is shut down during low load overnight an...

AI summary The document discusses the importance of asset health in asset management decisions, particularly in relation to unit operations and utilization factors (UF). It also outlines how NS Power uses the PLEXOS model to forecast utilization and how sustaining investments are estimated based on UF, life consumption, and failure mechanisms for different asset classes.

Section 68
nvestment associated with turbines, boilers and high energy 22 piping. Major assets are regularly re-assessed in terms of their condition and intended service as 23 NS Power’s operational data, utilization plan, asset health information, a...

AI summary The text discusses the investment in major assets such as turbines, boilers, and high-energy piping, and the regular reassessment of these assets based on operational data, utilization plans, and forecasts. It also includes a table showing the forecast unit utilization factors for various units up to 2032.

Section 126
ociated prioritization of asset 26 replacement (i.e. conductor line, poles, cross-arms, guywires, and hardware replacement). 27 28 Transmission line inspections consist of the following actions: 57 https://www.npcc.org/program-areas/standa...

AI summary The text outlines the prioritization of asset replacement for transmission lines, including conductor line, poles, cross-arms, guywires, and hardware, as part of the 2022 10-Year System Outlook. It also references a link to the North American Electric Reliability Corporation's regional criteria directories.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →