ng systems) and accelerates failure mechanisms; 24 therefore, these must also be considered to properly estimate the service interval and 25 appropriate maintenance strategies. 26 DATE FILED: June 27, 2024 Page 25 of 67 2024 10-Year System...
AI summary The document emphasizes the importance of asset health in asset management decisions, particularly in determining the operational capabilities of generating units. It also discusses the use of the PLEXOS dispatch optimization model to forecast unit utilization factors (UF) and assess their impact on system operations.
Unit 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TRE-5 L L L L - - - - - - - TRE-6 H H H H M L - - - - - TUC-1 M M L L L L UL UL UL UL UL TUC-2 H M M M M H H H M M H TUC-3 H H M H M H H H H H H TUC-4 H H H H H H H H H H H TUC-5...
AI summary The text discusses projected sustaining investments for various units, based on utilization forecasts and failure mechanisms. It highlights that NS Power does not account for unplanned failures in these estimates and explains how different asset classes are evaluated, with some prorated by utilization factor and others influenced by additional factors.
the Directory 1 Working Group that is performing the review. 27 Voting by NPCC members on the updates proposed by the Directory 1 Working Group is 28 scheduled to conclude on June 27, 2024. 29 DATE FILED: June 27, 2024 Page 54 of 67 2024 1...
AI summary The NPCC Directory 7 Working Group is reviewing the design criteria and review process for Remedial Action Schemes (RAS), with the review expected to be completed in Q3 2024. NS Power is involved in the Directory 7 Working Group. NS Power also has a comprehensive maintenance program for the transmission system aimed at ensuring reliability and extending asset life.
ssociated prioritization of asset 19 replacement (i.e. conductor line, poles, cross-arms, guywires, and hardware replacement). 20 21 Transmission line inspections consist of the following actions: 22 • Visual inspection of every line once...
AI summary The text outlines the prioritization of asset replacement and the inspection procedures for transmission lines, including annual visual inspections, three-year foot patrols, and LiDAR surveys for non-BPS lines. BPS lines undergo LiDAR surveys every two years and foot patrols in the third year. These inspections help identify asset deficiencies and ensure proper line ratings.