• Maintenance: Provides scope of regular maintenance activities including those for facilities and the management of CFB residue. Date: July 2021
AI summary The document outlines the scope of regular maintenance activities, including those for facilities and the management of CFB residue, with a date of July 2021.
4.5 Placement of Ash Fly and bottom ash transported to the CFB Residue Management Site is placed in the active cell areas by a grader. The ash is placed by end-dumping and spreading to the lower (depression) areas to establish a surface fr...
AI summary The document outlines procedures for placing and compacting ash residue at the CFB Residue Management Site, including layer thickness, compaction methods, moisture control, and surface grading to ensure stability and runoff. Testing and monitoring are emphasized to maintain quality and safety.