N-1Application
7 passages
10 Note 1: Converters and substation operations, marine surveillance, and service 11 agreements for asset maintenance programs have been aggregated to protect against 12 disclosure of commercially sensitive information. 13
AI summary The text notes that certain operations and agreements have been aggregated to protect commercially sensitive information, including converters and substation operations, marine surveillance, and service agreements for asset maintenance programs.
Highly Complex Asset: As further elaborated upon in Concentrics's Expert Evidence, the Maritime Link is a highly complex set of assets. The High Voltage Direct Current ("HVDC") interconnection comes with increased operational risk as compa...
AI summary The Maritime Link is a highly complex asset involving HVDC technology, subsea cables, and complex agreements with NLH. It has a higher debt-to-equity ratio compared to traditional T&D utilities, increasing operational and financial risks. Comparators with subsea transmission assets are limited, and ROE ranges are provided for reference.
Date Filed: July 18, 2025 Page 27 of 29 1 8.0 ASSET MANAGEMENT OUTLOOK 2 3 In the 2025 Assessment Decision, the Board directed NSPML to file its Asset 4 Management Plan as part of its 2026 Assessment Application. Please see partially 5 con...
AI summary The document discusses NSPML's 10-year Asset Management Outlook, which was filed as part of its 2026 Assessment Application. It includes information on near-term expenditures such as the Cable Protection Project and upgrades to HVDC station control and monitoring systems.
NSPML's Asset Management Outlook July 18, 2025 1 1.0 INTRODUCTION 2 3 NSPML has the obligation to manage the operation and maintenance of the Maritme Link 4 in accordance with Good Utility Practice for a long-term, low cost, reliable trans...
AI summary NSPML is responsible for managing the Maritime Link in accordance with Good Utility Practice, ensuring its long-term, low-cost, reliable operation. The NSEB, NLH, and Canada's Independent Engineer oversee NSPML's activities. The document outlines NSPML's asset management outlook for the next ten years, focusing on maintenance, safety, and performance.
3.0 SUSTAINING CAPITAL OUTLOOK In the context of sustaining capital requirements, NSPML is unique in that it is focused on the asset management and operations of a singlular linear transmission asset. While the combination of assets within...
AI summary NSPML's sustaining capital outlook focuses on periodic maintenance and upgrades for the Maritime Link transmission asset. Major projects are expected to be periodic rather than annual, with mid-size initiatives increasing around asset milestones. The outlook is subject to change based on asset health, market factors, and vendor availability.
- 2 be subject to NSEB regulatory oversight. 1 4.0 FIVE YEAR OUTLOOK - PLANNED SUSTAINING CAPITAL PROJECTS (2026-2031) 2 3 There are two material sustaining capital initiatves under development in the near term; the 4 first is the Submarin...
AI summary The document outlines two major sustaining capital initiatives: the Submarine Cable Protection Project and the replacement of the Station Control Monitoring (SCM) system. Both projects are under development and require regulatory approval from the NSEB. The SCM system update is necessary due to obsolescence and difficulty in sourcing parts, with plans to submit a future capital application.
years and project timing and costs will be primarily driven by asset condition at the time. 1 7.0 SUMMARY 2 3 NSPML will continue to focus on meeting its obligations regarding the operation and 4 maintenance of the Maritme Link in accordan...
AI summary NSPML will focus on maintaining the Maritme Link in accordance with Good Utility Practice. Near-term sustaining capital requirements include the Submarine Cable Protection project (M12285) and a Station Control and Monitoring project. Routine sustaining capital will be reported and approved as needed, with insights provided in annual reporting.
N-8NSPML (NSEB) RIR 1 to 44 - Redacted
9 passages
NON-CONFIDENTIAL 1 Request IR-05: 2 3 IR-2 to IR-31 Reference Exhibit N-1 Pages 4 -29 4 5 Page 8 6 NSPML states: "NSPML has not completed its assessment for planned transmission line and 7 related inspection and maintenance work into 2027...
AI summary NSPML has not completed assessments for planned transmission line and related inspection and maintenance work into 2027 and beyond, stating that estimating costs beyond 2026 is premature and subject to high uncertainty. The Nova Scotia Energy Board is requesting clarification on the infrastructure involved, the nature of the uncertainties, and the alignment of this work with NSPML's Long-Term Asset Management Plan.
1 Response IR-05: 2 3 a) Confirmed. 4 9 b) NSPML's transmission line maintenance program mainly consists of inspections, execution of vegetation management, and corrective maintenance. The table below provide commentary on the degree of un...
AI summary NSPML's transmission line maintenance program includes inspections, vegetation management, and corrective maintenance. The text mentions a table that provides commentary on the degree of uncertainty related to these activities.
2 c) These activities are part of NSPML's LTAMP. Please refer to NSEB IR-31. 3 4 d) NSPML received the following summary description from NS Power regarding how they 5 conduct their transmission line assessments: 6 The objective of the tra...
AI summary The document outlines NSPML's Long-Term Asset Management Plan (LTAMP) and describes NS Power's transmission inspection program. The program aims to ensure system integrity, regulatory compliance, and public safety through various inspection methods, including foot patrols, drone inspections, and LiDAR surveys. Inspection frequency varies based on line criticality and accessibility.
NSPML Responses to Nova Scotia Energy Board Information Requests 1 Request IR-15: 2 3 IR-2 to IR-31 Reference Exhibit N-1 Pages 4 -29 4 5 Page 12 6 NSPML states: "As also noted in the 2025 Assessment, NSPML has adopted a condition 7 based...
AI summary NSPML has conducted a LiDAR survey in 2024 for vegetation management on transmission lines and is analyzing the results to determine near-term vegetation management needs. The survey cost in 2024 is disclosed, with a budget for 2025 analysis and planned future surveys in 2026 and 2028.
4 Year # IGBTs Failed IGBT Annual Failure Rate IGBT Spares Rec'd IGBT Inventory Year End Sustaining Capital IGBT in Assessment $M Sustaining Capital IGBT - Expenditure $M 2018 6 0.11% 74 2019 8 0.15% 74 2020 8 0.15% 74 2021 3 0.06% 74 2022...
AI summary The table provides data on IGBT failures, annual failure rates, spares received, inventory levels, and sustaining capital expenditures related to IGBTs from 2018 to 2026. It includes projections for 2026 and notes that spares are not expected to be received until 2026.
2.1 Transmission Asset Managers - (a) Operation and Maintenance of NL Transmission Assets From and after the completion of Commissioning, Nalcor shall, with respect to the NL Transmission Assets: - (i) develop and maintain a Long Term Asse...
AI summary The text outlines the operational and maintenance responsibilities of Nalcor and Emera for the NL Transmission Assets and Maritime Link, respectively, including the development of Long Term Asset Management Plans, performance of O&M activities, and compliance with applicable laws.
5.3 No Role of JDC-ML For greater certainty, the Parties agree that the joint development committee established pursuant to the ML-JDA will have no role in the approval of the Initial LTAMPs, the Initial LTAMP Cost Estimates, the In-Servic...
AI summary The parties agree that the joint development committee (JDC-ML) established under the ML-JDA will not be involved in the approval of various LTAMP-related documents, including initial and in-service plans and cost estimates.
9.9 Site Visits The Manager will provide to the other Party evidence of liability and automobile insurance in anticipation of any visits to the site of any Transmission Assets managed by the Manager pursuant to this Agreement.
AI summary The Manager is required to provide evidence of liability and automobile insurance to the other Party prior to any site visits to Transmission Assets managed under the Agreement.
REDACTED 1 "Long Term Asset Management Plan" or "LTAMP" means, for each of the Defined Assets, 2 a plan describing and quantifying the O&M Activities, in the case of the Transmission Assets, 3 or the MFP Operating and Maintenance Activitie...
AI summary The Nova Scotia Energy Board (NSEB) is requesting clarification on how Attachment 2 meets the definition of the Long Term Asset Management Plan (LTAMP) and the costs incurred by NSPML in preparing the LTAMP from 2021 to 2026. NSPML responds that the Asset Management Outlook is a subset of the Company's asset management plans, created for regulatory purposes while balancing disclosure and commercial negotiations.