HomeAsset ManagementM12742Evidence
Topic/Matter Intersection

Topic:"Asset Management" in M12742

Matter: Nova Scotia Power Inc. - 2025 Annual FAM Report  (Fuel Adjustment Mechanism)
2 passages 1 document

Asset Management across all matters →

N-1Annual FAM Report 2025 - Redacted 2 passages
Plant Maintenance p. p. 2
Plant Maintenance OM&G Expense by Operating Group Actual 2025 Actual 2024 Actual 2023 Actual 2022 Actual 2021 Actual 2020 Actual 2019 Budget 2025 Budget 2026 Pt. Aconi 21.0 19.8 11.5 15.3 12.2 12.4 14.8 19.1 12.7 Trenton 11.2 11.8 11.7 12....

AI summary The document presents a table showing OM&G expenses by operating group from 2020 to 2025, including actual and budget figures, along with specific maintenance and refurbishment projects under various operating groups such as Hydro, Combustion Turbine, and Fuel, Energy & Risk Management.

Major Projects - 2025 p. p. 2
Major Projects - 2025 PHB- SD UU Wennberg South Screw Re. PH Biomass POA LP HIP Turbine Refurb. Pt. Aconi POA Boiler Refurbishment Pt. Aconi POA PE Cell 4 phase 3 development Pt. Aconi POA Boiler Refractory Refurb. Pt. Aconi POA Coal Galle...

AI summary The text lists a series of major projects scheduled for 2025, including turbine refurbishments, boiler repairs, and infrastructure upgrades at various locations such as Pt. Aconi, Trenton, Tufts Cove, and others. These projects are part of ongoing maintenance and improvement efforts in the energy sector.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →