Plant Maintenance OM&G Expense by Operating Group Actual 2025 Actual 2024 Actual 2023 Actual 2022 Actual 2021 Actual 2020 Actual 2019 Budget 2025 Budget 2026 Pt. Aconi 21.0 19.8 11.5 15.3 12.2 12.4 14.8 19.1 12.7 Trenton 11.2 11.8 11.7 12....
AI summary The document presents a table showing OM&G expenses by operating group from 2020 to 2025, including actual and budget figures, along with specific maintenance and refurbishment projects under various operating groups such as Hydro, Combustion Turbine, and Fuel, Energy & Risk Management.
Major Projects - 2025 PHB- SD UU Wennberg South Screw Re. PH Biomass POA LP HIP Turbine Refurb. Pt. Aconi POA Boiler Refurbishment Pt. Aconi POA PE Cell 4 phase 3 development Pt. Aconi POA Boiler Refractory Refurb. Pt. Aconi POA Coal Galle...
AI summary The text lists a series of major projects scheduled for 2025, including turbine refurbishments, boiler repairs, and infrastructure upgrades at various locations such as Pt. Aconi, Trenton, Tufts Cove, and others. These projects are part of ongoing maintenance and improvement efforts in the energy sector.