Matter: Nova Scotia Power Inc. - CI C0080101 – 539N-201 Big Island Subsea Cable Replacement - $4,388,679
2 passages 1 document

Asset Management across all matters →

101647NSEB (NSPI) IR-1 to IR-16 2 passages
Request IR-5:
Request IR-5: - a. Please describe the cause(s) of the fault on the subsea cable installed in 1977 and the rationale for the decision to replace it with the subsea cable installed in the 1990s. - b. Please explain how NS Power determined t...

AI summary Request IR-5 seeks explanations regarding the 1977 subsea cable's faults, the rationale for replacing it with a 1990s cable, NS Power's assessment of the 1977 cable post-1990s failure, and any subsequent faults since 1999. It also questions why a prior condition assessment of the 1977 cable was not conducted before installing the 1990s cable.

Request IR-9:
Request IR-9: - a. Please describe the plan for the existing cables after the completion of the new cable installation. - i. If the plan is to remove, abandon or decommission the existing cables, please confirm whether the quoted budget in...

AI summary Request IR-9 seeks clarification on the fate of existing cables post-new installation, including removal/decommissioning plans, budget inclusion, rationale for retention, and whether the 1977 cable will remain for redundancy.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →