Matter: Nova Scotia Power Inc. - CI C0059046 - 101S and 79N Reactor Replacements - $827,209 (FIN)
1 passage 1 document

Asset Management across all matters →

N-1CI C0059046 - 101S and 79N Reactor Replacements - Application 1 passage
Why do this project this way? p. p. 1
Why do this project this way? The failed reactor at 79N was manufactured in 1999 and has successfully operated for nearly its expected operating life, making a like-for-like replacement appropriate at this location. The reactors at 101S ha...

AI summary The failed reactor at 79N is being replaced with a like-for-like model due to its nearing end of life, while the reactors at 101S require an equivalent replacement with surge capacitors due to increased failure rates and voltage spike protection needs.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →