Matter: CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders  in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project
7 passages 2 documents

Asset Retirement Obligation across all matters →

N-1Application 4 passages
1 3.0 COMMERCIAL TRANSACTION 2 3 The transaction between NSPI and 324 NSL represents an asset purchase and payment for 4 development costs. 324 NSL is a wholly owned subsidiary of Emera Inc. NSPI acquired all of 5 the Project assets directly from 324 NSL with the exception of the PPA and PPA performance 6 security. These items remain with 324 NSL. NSPI will reimburse 324 NSL for various 7 development costs associated with the Project. 8 9 The detailed Asset Purchase Agreement between NSPI and 324 NSL is provided in Appendix 4. 10 The following assets are included in the Agreement: 11 12 Engineering and Wind Studies for the Site 13 Original Engineering Design Documents 14 Environmental Approval Documents 15 Meteorological towers and Transport Canada Approvals for the meteorological 16 towers 17 General Electric Turbine Supply Agreement 18 Land Leases (Turbine and Non-Turbine) 19 Emera Utility Services Engineering, Procurement and Construction (EPC) 20 Contract 21 ecoENERGY Documents and Agreement 22 Generation Interconnection Agreement 23 Magna Transformer Purchase Agreement 24 Environmental Protection Plan 25 Transmission Line Easements Options 26 27 An important aspect of the transaction between NSPI and 324 NSL was for NSPI to maintain p. p. 17
1 3.0 COMMERCIAL TRANSACTION 2 3 The transaction between NSPI and 324 NSL represents an asset purchase and payment for 4 development costs. 324 NSL is a wholly owned subsidiary of Emera Inc. NSPI acquired all of 5 the Project assets direct...

AI summary NSPI acquired Project assets from its affiliate 324 NSL, retaining the right to license the assets back for operation and maintenance. The transaction allows NSPI flexibility in meeting RES compliance while preserving project benefits for customers. The structure supports achieving compliance through other projects if needed.

PROMISSORY NOTE p. p. 62
PROMISSORY NOTE Principal: WHEREAS Nova Scotia Power Incorporated (the "Undersigned") entered into an asset purchase agreement with 3240384 Nova Scotia Limited (the "Holder"), as seller, dated as of May 28,2010 (the "Agreement") pursuant t...

AI summary Nova Scotia Power Incorporated entered into an asset purchase agreement with 3240384 Nova Scotia Limited in 2010 to purchase certain assets and pay development costs incurred by the Holder.

A. Assets Acquired by 3240384 Nova Scotia Limited since December 23, 2009: p. p. 62
Asset/Document Parties Date

AI summary The document outlines a list of assets acquired by 3240384 Nova Scotia Limited since December 23, 2009, with columns for the asset or document, parties involved, and the date of acquisition.

.. : p. p. 62
.. : Restated Option Agreement 3240384 Nova Scotia Limited Anne M. Boudreau Anita E. Boudreau PIO 30149793 Amended and Restated Option Agreement 3240384 Nova Scotia Limited Eileen Frances Brinton February 25, 2010 PIO 30152227 Amended and...

AI summary The text lists several PIO numbers associated with Amended and Restated Option Agreements involving parties such as 3240384 Nova Scotia Limited and various Boudreau individuals. It also references asset documents related to the purchase from Interwind Corp. and Scotian Windfield Partners Corp.

N-3-(b)Redacted NSPI Response to UARB IR-12 (att 7-10) to IR-17 3 passages
.4 Identifying Nameplate p. p. 3
.4 Identifying Nameplate - .1 The Recloser assemblies shall be provided with one (1) nameplate, engraved on 3mm thick plastic lamicoid, with the Owner's numerical designation for the Power Transformer. - .2 The identifying nameplate shall...

AI summary The text specifies requirements for the identification and installation of nameplates on Recloser assemblies, including material standards and specifications for durability and visibility. It also outlines general material quality requirements for components in the package.

Section 2453 p. p. 3
- .2 CSA Standards - .1 C156.1, Ceramic and Glass Station Post Insulators - .2 G164, Hot Dipped Galvanized or Irregularly Shaped Articles - .3 W59, Welded Steel Construction (metal-ark welding) - .3 NEMA Standards - .1 Std. SG-6, Power Swi...

AI summary This document outlines the standards and submittal requirements for electrical components, including CSA, NEMA, ANSI/IEEE, and ISO standards, as well as specifications for operation and maintenance data and manufacturer drawings for disconnect switches.

Section 3458 p. p. 160
- .8 Formwork: - .1 Forms: to CSA-A23.1, plywood and lumber, clean and free of loose knots, splits or metal. - .2 Form Ties: to CSA-A23.1, removable or snap-off metal ties, fixed or adjustable length. Form ties, tie wire, spacers or other...

AI summary The text outlines specifications for formwork and concrete mix, referencing various Canadian standards and testing methods. It details requirements for materials such as form ties, release agents, and curing compounds, as well as specifications for concrete mix proportions and air content.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →