N-1Report 2 passages
Section 52
1 3.2.4 Annapolis Tidal 2 3 The Annapolis Tidal Generating Station ceased generation in January 2019 following the failure 4 of a crucial station component. Subsequently, NS Power completed an analysis to determine 5 whether continued rein...

AI summary The Annapolis Tidal Generating Station ceased operations in 2019, and NS Power determined it should be retired. NS Power applied to the NSUARB for approval to treat the station as Not Used and Not Useful and to amortize the asset over 10 years, but the NSUARB deferred a decision. NS Power continues to assess the station with environmental regulators and provided updates to the NSUARB, with no capacity or energy contribution assumed in the 2024 10-Year System Outlook.

Section 72
they typically have material volume-based failure mechanisms. In contrast, 10 the UF is directly applicable to the investment associated with turbines, boilers and high energy 11 piping. Major assets are regularly reassessed in terms of th...

AI summary The text discusses investment strategies for maintaining unit reliability in thermal fleet operations, focusing on extending major outage intervals to reduce capital investment and managing risks through less intensive investment approaches. It also references a 2024 10-Year System Outlook document.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →